SMARTSCAN 5K8 Series Installation Sheet Download Page 1

SMARTSCAN 5K8 SERIES LIGHT CURTAIN              

1

CD401/130711

INSTALLATION SHEET EXPLAINED

Please note that the Installation Sheet Explained documents are periodically updated.  The product Installation Sheets 
supplied with the product should be referenced first for current installation information.

5K8 Series Safety Light Curtain

Installation Sheet (CD339/060711)

Figure A 

Unpacking

Remove all packaging material and retain it

Locate and keep the delivery note

Inspect all items for transit damage

Match goods supplied to those specified on the delivery note

Keep the Installation Sheet in a safe place

Each 5K8 system supplied would normally include:

Light curtain

Cables (A) and (B)

Installation sheet

Service questionnaire form

Storage requirements

Humidity - <95%

Temperature range between -20

C and +70

C

Summary of Contents for 5K8 Series

Page 1: ...ries Safety Light Curtain Installation Sheet CD339 060711 Figure A Unpacking Remove all packaging material and retain it Locate and keep the delivery note Inspect all items for transit damage Match go...

Page 2: ...B K Detection zone width R Scanning range of the light curtain Detection zone width K Must be of a suitable height for each application to prevent personnel access to the danger area either over under...

Page 3: ...receiver head of the 5k8 series Since the X cable is a 25 pin D type connector with a Plug and Socket the X cable can also be used as an extension cable for either A Interface cable or the B User cabl...

Page 4: ...t intermittent tripping of the light curtain ensure that extraneous infrared energy between 800 and 1000 nanometres is not directed towards the Perspex window of the receiver unit RX Extraneous source...

Page 5: ...nstallation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information Figure E shows...

Page 6: ...The system works by the square pallet load moving into the two mute beams and interrupting them The two mute beams are monitored with a disparity timer of two seconds to provide a mute initiation of t...

Page 7: ...ontact switching power 24V DC 2A or maximum 110V AC 2A Status Output F2 Relay provides one non safety volt free switching contact which is internally connected to the wires in the multi core user cabl...

Page 8: ...o 24V DC Maximum switching current rating is 500mA Mute lamp output F9 This lamp is integrated within the horizontal muting arm of the light curtain The lamp acts as a visual warning indicator and wil...

Page 9: ...lock indicator F17 A red LED indicator mounted on the receiver unit illuminates when the light curtain is obstructed Safe output on F18 A green LED indicator mounted on the receiver unit illuminates w...

Page 10: ...mmatic arrangement of all the function LEDs and location on the 5K8 series safety light guard See Fig G above for a detailed explanation LED Status Indicators on the R X F14 Green Guard Clear F15 Yell...

Page 11: ...eriodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information Figure I shows all the input and output connections to and...

Page 12: ...ns from the Smartscan 5K8 Series are via a plug connected into the Receiver RX head Cable B User Note Prior to initial power up of the light curtain check the following Red RD blue BU wire mute enable...

Page 13: ...ing and guard override applications The timers used in cross beam muting are also shown below T1 Mute Disparity Time The maximum time allowed between activation of signals mute 1 M1 and mute 2 M2 This...

Page 14: ...ained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information Fig K shows the on board dip switches...

Page 15: ...pallet loads from one zone to another If the safety system trips when a pallet load is interrupting the sensing field of the light curtain the safety system cannot be restarted In order to remove the...

Page 16: ...process through each of the beams in the light curtain Ensure that while the test piece is obscuring each beam the output switches are OFF The test procedure should be carried out frequently as indica...

Page 17: ...igure N shows an operations chart for the 5K8 series Before installation read and understand the Installation Sheet provided paying particular attention to the information provided in Figure D Refer t...

Page 18: ...formation Figure O outlines the procedure for returning a Smartscan product If a fault occurs that cannot be resolved or the equipment is damaged return the system to the nearest Smartscan distributor...

Page 19: ...plained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information Figure P shows a list of the model...

Page 20: ...NED Please note that the Installation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation i...

Page 21: ...allation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information Figure R provides...

Page 22: ...ential that the mounting of the transmitter unit receiver unit and mirrors themselves are sufficiently rigid Alignment becomes increasingly critical as the range and number of mirrors increase Mirrors...

Page 23: ...ooking through a gun sight 5 A second person must adjust the mirror to the left and right until the Perspex window of the transmitter unit can be seen reflected in the mirror 6 If the light curtain is...

Page 24: ...with its mirror housing towards the first mirror Secure the first mirror 12 Again follow instructions 1 to 4 13 The second person must adjust the position of the second mirror to the left and to the...

Page 25: ...to the light curtain and check that the green LED beam indicator mounted on the receiver unit is on If not it may be necessary to finely adjust each mirror in turn to ensure the infra red energy from...

Page 26: ...note that the Installation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information...

Page 27: ...note that the Installation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation information...

Page 28: ...ease note that the Installation Sheet Explained documents are periodically updated The product Installation Sheets supplied with the product should be referenced first for current installation informa...

Reviews: