background image

 

 

SRU Board Revision Layouts 

Revision 5-7 Board

 

 

 

 

 

 

 

 

 

 

 

 

POWER 

TERMI

NAL 

DIP SWITCH 

Inputs 

525-532 

Inputs 

517-524 

Inputs 

501-508 

Inputs 

509-516 

Outputs 

601-608 

Outputs 

601-608 

LCD SCREEN 

Drive Port 

AUX Port 

NET Ports 

JTAG PROGRAMMING 

PORTS 

LCD NAVIGATION 

Dip Switch 1 

Summary of Contents for SRU

Page 1: ...PROGRAMMING INSTRUCTIONS for SRU Boards www smartrise us 1235 N Union Bower Rd Irving TX 75061 916 457 5129 ...

Page 2: ... Revision 5 7 Board POWER TERMI NAL DIP SWITCH Inputs 525 532 Inputs 517 524 Inputs 501 508 Inputs 509 516 Outputs 601 608 Outputs 601 608 LCD SCREEN Drive Port AUX Port NET Ports JTAG PROGRAMMING PORTS LCD NAVIGATION Dip Switch 1 ...

Page 3: ... SCREEN JTAG PROGRAMMING PORTS Inputs 525 532 Drive Port AUX Port NET Ports Inputs 517 524 Inputs 533 540 Inputs 501 508 Inputs 509 516 Inputs 549 552 Outputs 601 608 Outputs 601 608 DIP SWITCH B sSWITC HES Inputs 541 548 Outputs 617 624 LCD NAVIGATION ...

Page 4: ... board with either the CT or COP board 2 Reprogram it as the MR board DO NOT USE DIP SWITCH 1 DEFAULT ALL AFTER PROGRAMMING 3 Install the new board as the CT or COP board and program it as such The previous settings in the reprogrammed MR board will then transfer to the new board and the car should operate as before with all the original settings You can replace either the CT or COP board anytime ...

Page 5: ...lity to extract the file to a location of your choosing If not you will need to download a free program from the internet to process this file 2 Navigate to the location you saved the file and double click on it to show the contents 3 Some laptops won t allow the Smartrise programmer to run directly from a zip file To resolve this you need to copy all the contents of the zip file to a folder on yo...

Page 6: ...tware If not install the application by doing the following 1 Open the 5 New Smartrise Programmer Folder in your software package 2 Open the 1 Programmer Installer Folder 3 Install the Smartrise Programmer 4 Once the Smartrise Programmer is installed go back to the index of folders shown below and open the 1 Controller Software folder with the JCF Software file inside shown below ...

Page 7: ...b is 6 Open the JCF file by double clicking on it If it doesn t open then the Smartrise Programmer might not be correctly installed Please see previous page for installation instructions The Smartrise Programmer interface Note All the controller software is located on this interface except the group software ...

Page 8: ... appears then open My Computer and click on the CD ROM drive 2 Click on the Open folder to view files option to explore the Smartrise CD folders A list of folders with the software will appear The software is located in the 1 Controller Software folder It is imperative that you install the correct software onto the correct JTAG port To do this first connect your Smartrise programmer to your laptop...

Page 9: ...rd 5 Notice the progress report bar when programming is finished you will see a a Progress Done when programming is finished b NOTE You will also want to verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting from a controller 6 Next move your programming pod from port J21 to J22 then click on the J22 check box and begin programming 7 When programming is fin...

Page 10: ...ng interface to begin programming the board Notice the progress report bar when programming is finished the display will show Progress Done NOTE Verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting from the controller Next move the programming pod from port J21 to J22 click on the J22 check box and then Begin Programming When programming is finished CYCLE ...

Page 11: ...gin programming the board 5 Notice the progress report bar when programming is finished the LCD display will show Progress Done NOTE Verify that the POWER and RUN LED s on the programming pod itself are off before disconnecting it from a controller 6 Next move the programming pod from port J21 to J22 click on the J22 check box and the Begin Programming button 7 When programming is finished CYCLE P...

Reviews: