PLEASE CALL 1-888-755-4497 BEFORE RETURNING TO THE STORE.
WWW.SMART-POND.COM
15. Cut the stone that goes on the top of the spillway before building
the next layer of stones. Or use a retaining wall block cap in place
of the cut and add an inch of roofing shingles under the spillway.
Fig. 15
NOTE: The thickness of the weir is approximately 1”. You can cut
several pieces of stone to make this fit.
Fig. 15
16. Connect the Illumifalls to the transformer by pushing the plug into
the transformer socket until it is firmly seated. Hand tighten the nut
from the plug to the socket. Fig. 16
Fig. 16
17. Plug the transformer into a properly grounded electrical outlet.
Fig. 17
Fig. 17
18. Connect the pump to a proper power source. Fig. 18
Fig. 18
GFCI
Transformer
Plug from
Illumifalls
GFCI