background image

 

 

For more information on this product, visit www.smartharvestbyoutback.com 

 

SCCM20-100 

MPPT Charge Controller/Load Manager 

Owner’s Manual 

 

 

 

NOTE:   

Follow instructions in order. 

Charge batteries at least once a week. 

Use reducers to connect larger wires 
 to terminals. 

 

1

15 cm 

(6”) 

 

15 cm 

(6”) 

  

Mount on wall with 4 screws 

15 cm (6”) clearance 

 

Do not 

get wet

 

Do not 

drop

 

2

Install battery wires

 

No battery here

 

3

Install PV wires

 

< 20 amps

 

No PV here

 

4

0.25 amps <      < 20 amps

 

Install load wires

 

Do not 

open 

Do not disconnect  

battery while PV is active

 

Clearance and orientation

 

Remove 
wiring 
cover

 

= 12/24 volts only

 

Reviews: