
ENGLISH
5
PARTS & ASSEMBLY
Your
SMART Cascading Chocolate Fountain
requires little assembly. Prior to use, wipe
out Bowl with a damp cloth and dry. Wash Auger, Tiers, and Tower Cylinders in warm
soapy water, rinse, then dry.
After cleaning, return Auger to Base. Make sure Auger is securely in place by aligning
the opening on the bottom of the Auger with the Base Pin. Do not attempt to place
Auger, Tiers, or Tower Cylinders on Base or remove from Base while the motor is run-
ning. Make sure the Tower Cylinders are fitted on the posts in the Base properly.
After cleaning, return Auger to Base. Make sure Auger is securely in place by aligning
the opening on the bottom of the Auger with the Base Pin. Do not attempt to place
Auger, Tiers, or Tower Cylinders on Base or remove from Base while the motor is run-
ning. Make sure the Tower Cylinders are fitted on the posts in the Base properly.
SWITCH POSITIONS
Left: Heat Motor / Top: OFF / Right: Heat