RTM-ATCA-F140 Series Installation and Use (6806800M97M)
43
Chapter 2
Hardware Preparation and Installation
2.1
Overview
This chapter provides information on unpacking the RTM-ATCA-F140, safety precautions,
and requirements for the product. Included are the environmental and power requirements,
cooling considerations, and installation and removal procedures.
2.2
Unpacking and Inspecting the RTM
The shelf should provide minimum airflow to the RTM slot according to the PICMG 3.7 R1
Class B.4 requirements. This includes the following:
2.0CFM at 25°C ambient temperature
2.8CFM at 40°C ambient temperature
4.4CFM at 55°C ambient temperature
Shipment Inspection Procedure
The RTM is thoroughly inspected before shipment. Make sure you receive all items of your
shipment:
Printed
Quick Start Guide
Safety Notes Summary
RTM-ATCA-F140
1. Carefully inspect the product and all shipped components.
2. Request an RMA for product return at
https://www.smartembedded.com/ec/support/
if
any damage or discrepancies are observed with the items.
3. Remove the desiccant bag delivered with the system and dispose according to your
country’s legislation.
Use ESD
Wrist Strap
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can
damage circuits or shorten its life.
Before touching the blade or electronic components, make sure that you are working
in an ESD-safe environment.
Summary of Contents for RTM-ATCA-F140 Series
Page 1: ...RTM ATCA F140 Series Installation and Use P N 6806800M97M December 2020...
Page 6: ...6 RTM ATCA F140 Series Installation and Use 6806800M97M Table of Contents...
Page 8: ...8 RTM ATCA F140 Series Installation and Use 6806800M97M Table of Contents...
Page 10: ...List of Tables 10 RTM ATCA F140 Series Installation and Use 6806800M97M...
Page 22: ...22 RTM ATCA F140 Series Installation and Use 6806800M97M Safety Notes Safety Notes...
Page 81: ...1...