
30
EFE 2500 AP/APS/ANP/APH
After taking the pressure out, the freezer is ready to use. Place the Hopper
Cover, turn the control dial to SOFT or HARD mode and wait till the freezing
down has completed. The Freezer will stop and become quiet when the
Soft-serve is frozen down for the selected state of SOFT or HARD. (
Once
the machine has reached the selected hardness the refrigeration
compressor will automatically stop for pre-set intervals
).
12.3 DISPENSING ICE CREAM
After the Freezer has frozen down and stopped, pull the Dispensing Handle
and dispense about 300 grams of Soft-Serve into a washed and sanitized
beaker.
NOTICE: The temperature of the Soft-serve should be between: -6.5
º
C
and -8.0
º
C.
When a serve is dispensed the Freezer is automatically activated by the movement
detector switch when it senses the cone in hand being held below the dispense head
nozzle.
13. STEP-BY-STEP CLEANING - SANITIZING PROCEDURE
When properly used and cared for the machine will provide a consistent
quality Soft-Serve or Frozen Yoghurt. Like all equipment used to
manufacture food products it will require daily cleaning and regular
maintenance. A specified amount of care and attention is required
including but not limited to everything prescribed in this manual.
Attention
: Because of bacteria population increases very fast, cleaning
and sanitizing is vital. Extra attention must be given for cleaning and
sanitizing properly.
O-ring
89,69*5,33
O-ring
89,69*5,33
Summary of Contents for EFE 1500 A
Page 10: ...9 EFE 2500 AP APS ANP APH 7 PARTS IDENTIFICATION 7 1 Exploded View of Machine Figure 1...
Page 12: ...11 EFE 2500 AP APS ANP APH Figure 2...
Page 14: ...13 EFE 2500 AP APS ANP APH Figure 3...
Page 20: ...19 EFE 2500 AP APS ANP APH 7 6 Exploded View of Aeration Pump Figure 8...
Page 35: ...34 EFE 2500 AP APS ANP APH Make sure all brushes are available for brush cleaning Figure 23...
Page 36: ...35 EFE 2500 AP APS ANP APH Figure 24 Figure 25...
Page 53: ...52 EFE 2500 AP APS ANP APH 14 6 4 Aeration Pump Feeder Tube Air Adjustment Figure 68 Figure 69...
Page 58: ...57 EFE 2500 AP APS ANP APH 14 8 ASSEMBLY OF HOPPER AGITATOR TO THE MACHINE Figure 81 Figure 82...
Page 60: ...59 EFE 2500 AP APS ANP APH Figure 86 Agitator Plug for ANP and APH Figure 87 Figure 88...
Page 64: ...63 EFE 2500 AP APS ANP APH 16 ELECTRICAL CIRCUIT DIAGRAMS Figure 91...
Page 65: ...64 EFE 2500 AP APS ANP APH Figure 92...
Page 66: ...65 EFE 2500 AP APS ANP APH Figure 93...