SMA
Technologie AG
Replacing the varistors
Installation Guide
SB2500-11:SE2006
Page 37
If no ground contact and no defective varistor were found, there is probably a fault
in the Sunny Boy. In this case, contact the SMA hotline to discuss what to do next.
In case there are no spare varistors available the Sunny Boy 2500
still can feed electricity into the grid. The input is not protected
against overvoltages in this case. Replacement varistors should be
obtained as soon as possible. In system with a high risk of
overvoltages, the Sunny Boy 2500 should not be operated with
defective varistors.
9.
Reconnect the PE connection on the lid and close the Sunny Boy 2500.
10. Connect up the faultless PV generator strings to
the inverter.
11. Close off the unneeded DC input sockets using
the protective caps supplied in the accessories
kit.
12. Switch the line circuit breaker to the „on“
position.
13. Now check whether the LED display on the
Sunny Boy 2500 indicates that the device is
functioning correctly.
+
-
+
-
String 1
String 2
-
String 3
+
Summary of Contents for SUNNY BOY 2500
Page 2: ......
Page 6: ...Table of Contents SMA Technologie AG Page 6 SB2500 11 SE2006 Installation Guide ...
Page 8: ...Foreword SMA Technologie AG Page 8 SB2500 11 SE2006 Installation Guide ...
Page 10: ...Safety information SMA Technologie AG Page 10 SB2500 11 SE2006 Installation Guide ...
Page 38: ...Replacing the varistors SMA Technologie AG Page 38 SB2500 11 SE2006 Installation Guide ...
Page 44: ...Contact SMA Technologie AG Page 44 SB2500 11 SE2006 Installation Guide ...
Page 45: ......