Installation requirements
SMA
Technologie AG
Page 14
SB1700-11:SE2006
Installation Guide
When choosing the installation site, be sure to note the
following:
When choosing the installation site, ensure there is enough space for heat to
dissipate. Under normal conditions, the following guidelines should be applied for
the space to be kept clear around the Sunny Boy 1700:
In domestic installations, the unit should not be
mounted on plasterboard walls or similar as otherwise
audible vibrations are likely to result.
We recommend mounting the unit to a solid wall.
The Sunny Boy 1700 will emit a slight noise during
operation. This noise can be annoying when the Sunny
Boy is installed within a living area.
Unintentionally pulling out the DC plug connectors under load can
damage the plug and result in a serious injury! Install the Sunny
Boy in such a way that it is not possible (e.g. for children) to unplug
the DC plug connector accidentaly.
Individual components in the Sunny Boy can reach a temperature
of more than 60 °C.
Do not install the Sunny Boy on flammable construction materials,
in areas where highly inflammable materials are stored or in
potentially explosive environments!
Minimum clearance
Sides
20 cm
Top
20 cm
Underneath
20 cm
In front
5 cm
20 cm
20 cm
20
cm
20
cm
5
cm
Summary of Contents for SUNNY BOY 1700
Page 2: ......
Page 6: ...SMA Technologie AG Page 6 SB1700 11 SE2006 Installation Guide...
Page 8: ...Foreword SMA Technologie AG Page 8 SB1700 11 SE2006 Installation Guide...
Page 10: ...Safety information SMA Technologie AG Page 10 SB1700 11 SE2006 Installation Guide...
Page 38: ...Replacing the varistors SMA Technologie AG Page 38 SB1700 11 SE2006 Installation Guide...
Page 44: ...Contact SMA Technologie AG Page 44 SB1700 11 SE2006 Installation Guide...
Page 45: ......
Page 46: ......
Page 47: ......