SMA Solar Technology AG
Commissioning
Technical Description
SL6000-TEN081820
29
7 Commissioning
Check the following requirements before commissioning:
•
Secure fit on wall mounting bracket
•
Correct connection of the AC cable (grid)
•
Connection of DC cable (load resistor, any additional connections) is complete
•
All housing openings are sealed
•
All screw fittings are tight
•
The lid is securely screwed in place
Commissioning procedure
1.
Commission the AC feed-in generators.
2.
An illuminated green LED on the Smart Load indicates fault-free operation.