Switching the Grid Frequency
SMA Solar Technology AG
28
SL6000-TEN081820
Technical Description
6 Switching the Grid Frequency
In order to operate the Smart Load in Sunny Island systems with a 60 Hz grid, the jumper must be
disconnected from jumper slot "ENS 2" and be connected to slot "ENS 1".
Grid
Jumper slot
50 Hz grid
ENS 2
60 Hz grid
ENS 1
Summary of Contents for SMART LOAD 6000
Page 2: ......