5 Mounting
SMA Solar Technology AG
Installation Manual
COMGW-10-IA-en-13
17
Mounting the SMA Com Gateway on a Top-Hat Rail
Additionally required mounting material (not included in the scope of delivery):
☐ Top-hat rail (TH 35-7.5)
Requirement:
☐ The top-hat rail must be securely mounted.
Procedure:
1. Place the SMA Com Gateway onto the top-hat rail
from above and hook it in.
2
1
SMA
COM
GATEW
AY
SMA
☑ The SMA Com Gateway snaps into place.
2. Ensure that the SMA Com Gateway is securely in place.
Mounting the SMA Com Gateway on a Wall
Additionally required mounting material (not included in the scope of delivery):
☐ 4 screws suitable for the support surface and the brackets. Do not use countersunk screws.
☐ Where necessary, 4 screw anchors suitable for the support surface and the screws.
Procedure:
1. Press the four brackets on the rear side of the
SMA Com Gateway outwards.
☑ The brackets snap into place.
2. Mark the drill holes using the brackets as a template.
3. Drill the holes and insert the screw anchors if necessary. Do not drill through the brackets.
Summary of Contents for Com Gateway
Page 35: ......
Page 36: ...www SMA Solar com...