Sleipner SE-IP120 Installation Manual Download Page 17

 17

2685

13

2021

-

SE IP 80 & SE IP 120

Motor Installation

1.  Install the motor onto the motor bracket ensuring the couplings are engaged together correctly (top and bottom). 

(NB: The motor can be placed 

in all directions on the motor bracket. However, ensure the cable terminals are accessible for electrical installation later.)   

2.  If you are installing the motor at an angle of more than 30 degrees off vertical, the motor will require separate/ additional support. 

(NB: Do not 

position supports on the motors top cap.)  

3.  Fasten the bolts holding the motor to the motor bracket with the above torque. 

4.  Check the drive shafts are engaged by rotating the propeller. 

(NB: Rotating the propellers can be hard due to the gear reduction and the motor, 

however the propeller must be able to rotate via hand power.)

 

 

MC_0019

!

 Please refer to the graphic for special considerations relating to your model 

!

IMPORTANT 

The thruster motor assembly must be protected using suitable covering to avoid dust/debris ingress from fabrication/maintenance/shipbuilding 

operations. On completion of operations, the cover must be removed before operating the thruster.

MG_0073

1

2

3

FASTEN

(33 Nm)

(24 lb/ft)

Motor support

> 30°

Holding Key

IMPORTANT

Ensure the holding key 

and coupling are 

aligned when fitted

MG_0020

 

Thruster

Motor

Battery

12V or 

24V

Fuse

Main 

Switch

Nut

Tighten to 

18Nm/ 13.8lb/ft

Washers

Isolation Cap

Lugs

+

+

-

-

IMPORTANT

Do NOT use washers between lugs, this causes overheating 

and fire. Spring washers must be placed in the outer 

position before tightening the nut.

Hold in place for 

securing the end nut.

Multi-lug configuration

Ensure lug faces are 

back to back.

Spring 

Washer

Nut

Nut

Lugs

MC_0143

Thruster Electrical Installation

WARNING 

Check the following with the main switch is set to off :

After all electrical connections have been completed check with an ohm meter that there is no electrical connection between 

1. electro-motor flange and the positive terminal on the motor 

2. electro-motor flange and the battery negative terminal on the motor 

If unsure contact skilled personnel.

1.  Information of electrical table. 

see next page

- All power cable lengths represent the total length of the combined (+) and (-) cables.

- Battery capacity is stated as minimum cold crank capacity, (CCA).

- Use slow blow rated fuses to hold stated Amp-Draw for min. 5 minutes.

 

- Consider the AMP hours (Ah) for your specifi c duty cycle. 

2.  Use appropriate sized cables and batteries with high cranking capacity to feed the thruster. The actual voltage at the motor while running the 

thruster decides the motors output RPM and thrust. Use larger cables and stronger batteries for better results.

- See electrical specifi cations for advised minimum cables and batteries (CCA).

3.  Install the main switch as close to the battery as possible and ensure the main positive lead can take loads without noticeable voltage drop. 

 

- Ensure the main switch (battery isolator) can be turned off independently and manually when not on board or in emergencies. 

- Ensure it is easily accessible and update instructions that this should be turned off like the boat’s other main switches.

 

 

It is advised to install a fuse in the positive lead for protection against short-circuiting. 

        - Ensure a slow type and appropriately sized to take the amperage draw for at least 5 minutes.

(NB: For Ignition Protected installations remember to use ignition protected fuses and switches if fi tted in areas that require this feature. 

Ensure to follow your national regulations)

5.  Cable lugs must have adequate electrical and mechanical isolation and fi tted with cable lug covers.

6.  Fasten cables to the required torque. 

!

 Please refer to the graphic for special considerations relating to your model 

!

Summary of Contents for SE-IP120

Page 1: ...R AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE Installation Guide For Ignition Protected DC Electric Thruster Models SE IP80 SE IP120 EN I M 2685 1...

Page 2: ...Technical Specifications 5 Positioning of the tunnel thruster 6 Tunnel Length 7 Tunnel installation in sail boats 8 Water Deflection 9 Tunnel ends 10 Tunnel installation 11 12 Stern tunnel installatio...

Page 3: ...It is the responsibility of the installer to follow all applicable international and national regulations when installing Sleipner products The recommendations given in this document are guidelines O...

Page 4: ...WD Water Depth 185 7 28 185 7 28 215 8 46 TL Minimum tunnel length 179 7 05 179 7 05 233 9 17 TL recommended Recommended tunnel length 216 8 50 216 8 50 276 10 87 T min Minimum tunnel wall thickness...

Page 5: ...ools down Flexible coupling between electro motor and drive shaft protects electro motor and gear system if propeller jams Original Sleipner panels shut off automatically 6 minutes after last use Orig...

Page 6: ...as deep as possible under the waterline 2 Deeper installations prevent air from being sucked into the tunnel from the surface resulting in reduced thrust performance and increase noise levels during...

Page 7: ...ngth of the tunnel walls to vary in length excessively EG The top tunnel wall is x 4 longer than the bottom wall 2 If the tunnel is too long the friction inside will reduce the water speed and thereby...

Page 8: ...ead t the tunnel halfway into the underneath section of the existing hull Strengthen it with a deflector spoiler directing the water flow around the tunnel This will allow installation of the thruster...

Page 9: ...t is angled slightly down because of the water flow on this area 3 Making a deflector spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag The deflector spoiler w...

Page 10: ...unnel and thereby reduces the effective tunnel diameter and thrust Turbulence cavitation on the propeller will lessen the thrusters performance and create excess noise 2 For steel aluminium hulls angl...

Page 11: ...over the back face 5 Cut the tunnel ends to the desired shape and lightly sand its surface Clean the area with acetone or similar where you are going to apply breglass NB Do not cast or add breglass t...

Page 12: ...nnel installed and cast 1 Round the edges with a radius of 10 of the tunnel diameter 2 For steel aluminium hulls make a slope with a length of 10 15 of the tunnel diameter NB If this is not possible r...

Page 13: ...stallation please refer to the supplied manual in your Sleipner product delivery Stern Thruster SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUA...

Page 14: ...learance from each blade to the tunnel wall Place top motor bracket to measure the drive shaft has come through the motor bracket at the correct height Remove the gear leg and propeller for nal instal...

Page 15: ...end of the shaft spline Tighten with the propeller lock nut 3 Insert the anode to the end of the propeller and tighten the anode holding screw Apply a thread glue Loctite 243 or similar to ensure that...

Page 16: ...ing the motor to the motor bracket with the above torque 4 Check the drive shafts are engaged by rotating the propeller NB Rotating the propellers can be hard due to the gear reduction and the motor h...

Page 17: ...peci c duty cycle 2 Use appropriate sized cables and batteries with high cranking capacity to feed the thruster The actual voltage at the motor while running the thruster decides the motors output RPM...

Page 18: ...NA NA AWG 2 0 2 0 4 0 2 x 2 0 2 x 3 0 2 x 3 0 2 x 4 0 2 x 4 0 2 x 4 0 24 V 280 A DIN 300 SAE 570 EN 520 ANL 250 mm2 35 35 35 50 50 70 70 95 95 120 120 2 x 95 AWG 2 2 2 1 0 1 0 2 0 2 0 3 0 3 0 4 0 4 0...

Page 19: ...6 122x on SP75Ti SP95Ti and SP125Ti NB Make sure to not use any electronic interface box delay box older than the 6 1232i ex 6 122x NB Very important to check the following with main switch position A...

Page 20: ...1 3 Fuse Battery main switch 1 5 4 2 6 8 9 red grey sig blue sig black red grey sig blue sig brown 3 red Fused inside 1A black 7 white NB Make sure to not use any electronic interface box delay box o...

Page 21: ...d at the same time in opposite directions the electronic control box will stop the thruster until it receives a single signal or thrust in one direction Sleipner on off equipment it is entirely plug p...

Page 22: ...lation For Control Panel installation please refer to the supplied manual in your Sleipner product delivery MC_0398 SLEIPNER AS P O Box 519 N 1612 Fredrikstad Norway www sleipnergroup com DOCUMENT ID...

Page 23: ...gear house and propeller but NOT anodes sealing rubber ttings or propeller shafts Propeller is fastened correctly to the shaft Propeller turns freely in tunnel The anode and or holding screw is tighte...

Page 24: ...turned to the Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding...

Page 25: ...25 2685 13 2021 SE IP 80 SE IP 120 MC_0037 Notes...

Page 26: ...26 2685 13 2021 SE IP 80 SE IP 120 MC_0037 Notes...

Page 27: ...27 2685 13 2021 SE IP 80 SE IP 120 MC_0037 Notes...

Page 28: ...accuracies or omissions it may contain Continuous product improvement may change the product speci cations without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Reviews: