
10
1473
8
2021
-
ESI
Pre Installation check.
- The unit is not water resiststant and must be placed in a dry area close to the windlass motor.
- Use ring termianls of good quality with the correct size for the selected battery cables. Bolt hole shuld be 6mm.
- The control unit must be mounted with the the cables protruding downwards.
1. Mount the ECU to a dry surface area. Ensure attached cables will protrud downwards.
(NB: The unit has mounts that ensures space between the
unit and it’s mounting surface. This to avoid condensation to enter the unit. It also ensures proper ventilation of the enclosure.)
2. Remove the cable cover plate.
3. Attached cables. Pay attention to assemble the terminal spacers and washers in the correct order. Tighten the teminals to maximum 8 Nm.
4. Remount the cable cover plate.
MC_0404
ECU Installtion
MG_0471
1
2
3
4
Nut
Spring washer
Cover plate
Cover plate
Washer
Cable lug
Spacer