background image

 

Date of Installation:

Boiler Model #:

Installed By:

Contact a qualified service technician before remodeling, for annual

service/maintenance, before extended periods of shutdown,

and before start-up.

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600

FAX: (516) 484-0933 

• 

Canada: Slant/Fin LTD/LTEE, Mississauga, Ontario

Summary of Contents for 473915000

Page 1: ...ithin the required clearance to combustibles 4 Ensure the supply of combustion air to the appliance is not obstructed or cut off Ensure the proper ventilation to the appliance area is maintained 5 Do not tamper with unit or controls call your service agent WARNING Maintenance and Service must be completed by qualified agency Modification substitution or elimination of factory equipped supplied or ...

Page 2: ...ustion chamber Chimney vent only does not apply to direct vent boilers diameter hole is required in the flue pipe between boiler and barometric damper to take draft CO2 smoke and temperature readings Adjust air shutter on oil burner to obtain trace of smoke Measure CO2 at this point Increase air adjustment to lower CO2 by one half 1 2 percent to one 1 percent Verify zero 0 smoke and correct draft ...

Page 3: ...ee of dirt lint and oil to maintain proper air fuel requires to burn Boiler Cleaning Instructions Have a qualified service technician perform cleaning Shut off all electrical power to boiler burner and shut off fuel supply Remove 4 bolts for access to combustion chamber If boiler is equipped with flexible fuel lines swing door open Remove vent connector Remove baffles for cleaning 4 5 6 section bo...

Page 4: ... qualified service technician before remodeling for annual service maintenance before extended periods of shutdown and before start up SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 0933 Canada Slant Fin LTD LTEE Mississauga Ontario ...

Reviews: