12
5. Locate the last leg(6) and two Spacers(7) as shown,
secure with M6x60mm Bolts(13), M6 Nuts(11) and
M6 Washers(12).
Note:
Tighten all the nuts.
6. Insert the assembled handle into the Leg welding(5)
as shown, secure with M6x33mm Bolts(15),
M6 Nuts(11) and M6 Washers(12).
7. Lay the Mat with pad(8) on the frame.
Adjust the position of the Mat with pad,
so that the slits are directly above the legs.
5
13
13
13
11
12
11
12
11
12
6
7
7
6
7
wire
wire
12
11
15
12
11
15
wire
wire
wire
8
slit