SALSA
13.
Now fold the reserve chute with a
„double-S fold“ (see graphic) and place
the reserve container with the line pocket
in the direction of the base/main riser.
Packing Instruction
37
36
Packing Instruction
11.
You are done with the sorting of the
panels
12.
so now you can inspect the middle line
towards the main riser to see if the middle
line is free.
9.
Now return to the channel and
run your hands along the con-
necting points of the middle
lines until they are free of the
material.
10.
The extra material simply can
be pushed up inside the channel
as in the picture.
The reason for this is to prevent
the material from burning during
a deployment.
9
10
11
13
12
EN