Assembly & Operation Manual
When happy with movement, remove vectoring pipe.
Fit former to vectoring pipe
Trail fit tail feather to former. Check clearance at nozzle. Tail feathers must be able
to move 360 degrees.
When happy glue with 30 minute epoxy.
Refit vectoring pipe and check operation. Pipe should be able to move on X-Y axis.
Repeat for other nozzle.
P-21
Photo 71
Photo 72
Photo 73
Photo 74
Photo 75
Photo 76