INSTALLATION
INSTRUCTIONS
GardWalk Paver Walkway
7
Support: +1 877 417 6336
www.skylinegroupintl.com
4
5
Attach top rails to posts using x4 20mm tek screws per post. *For Manitoba installations,
trim down posts so the top rail is 1060mm from the walkway surface.
Attach mid rails to posts using x2 48mm tek screws per post.