SECTION 2, Page 21
May 2002
SJIII Series E -
The CONVENTIONALS
118931AH
6.
Raise the Platform:
1- Ensure the emergency stop button is pulled
out. Select “LIFT” position with the Lift/Off/
Drive Toggle Switch.
2- Earlier models: Depress and hold the Enable
push-button (if equipped), then lift the controller
lock ring.
Later models: Activate and hold the Enable
trigger switch (by squeezing it towards the
joystick)
3- Push the controller handle forward to raise the
platform until a desired height is reached.
4- Return the joystick to the neutral center position
to stop. Release the Enable switch (if
equipped).
NOTE:
If the platform will not lift and alarm sounds (if equipped),
MACHINE IS NOT LEVEL or outriggers are not
properly set!
Make necessary adjustments to level
machine!)
Operation - Retracting The Outriggers
1.
Fully lower the platform:
1- Ensure the emergency stop button is pulled
out. Select “LIFT” position with the Lift/Off/
Drive Toggle Switch.
2- Earlier models: Depress and hold the Enable
push-button (if equipped), then lift the controller
lock ring.
Later models: Activate and hold the Enable
trigger switch (by squeezing it towards the
joystick)
3- Pull the controller handle backward until the
platform is fully lowered.
4- Return the joystick to the neutral center position
to stop. Release the Enable switch (if
equipped).
2.
Push and hold pairs (front or rear) of Outrigger Up/
Down Toggle Switches to “UP” position until the
outriggers are fully retracted.
Note
Switches are used to protect the outriggers from being
damaged. If machine will not drive, visually check to
see that ALL outriggers are fully retracted.
During Operation
1.
Check the level of the machine frequently by
lowering the platform slightly and then attempt to
raise the platform. If alarm sounds (if equipped),
LOWER THE PLATFORM IMMEDIATELY!
Make
the necessary adjustments to level the machine!
5.
To turn off the inverter, push in the “EMERGENCY
STOP” switch located on the operator’s control box
to the open position, or slide the “ON/OFF” switch
located on the front face of the inverter to the “OFF”
position.
Note
When the inverter is not in use, the “EMERGENCY STOP”
switch located on the operator’s control box should be
pushed to it’s opened position. This will turn off the
inverter.
Outrigger Operating Proce
dures
(Machines with Outrigger Option)
Before Operation
1.
Check overhead clearances and ground
obstructions. This will require the operator to
move around the platform.
2.
Check that the supporting surface under the tires
and outrigger pads is firm and stable.
DO NOT
place outrigger pad on a street drain or manhole
cover. The operator is responsible for deciding
whether blocking (such as timbers) is needed.
3.
Check that the platform is fully lowered. (The
outrigger controls are cut out when the platform
is raised.)
Operation - Extending The Outriggers
1.
From the operator’s platform control box, select
“PLATFORM” with the BASE/OFF/PLATFORM”
keyswitch. Select the “LIFT” position with the
“LIFT/OFF/DRIVE” toggle switch.
2.
Push and hold each Outrigger Up/Down Toggle
Switch to “DOWN” position extending each of
the outriggers to obtain firm ground contact.
3.
Check outrigger pad contact surface! Make
adjustments as necessary.
4.
Again, push and hold each Outrigger Up/Down
Toggle Switch to “DOWN” position extending
each of the outriggers until the machine is
completely supported by the outriggers.
5.
Level the machine. AGAIN, CHECK THE
OUTRIGGER PAD CONTACT SURFACE!