Section 4 – Pre-operation
Visual & Daily Maintenance Inspections
4.2-8 Platform assembly
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all fasteners are securely in place.
▪
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
▪
Ensure all railings
2
are properly positioned
and secured.
▪
Ensure gates/drop bars
3
are in good
working order.
▪
Ensure footswitch
4
is in good working
order and has not been modified, disabled or
blocked.
▪
Ensure MEWP floor
5
is secure and there is
no visible damage.
5
Platform control console
▪
Ensure all switches/controllers are returned to
neutral.
▪
Ensure there are no loose or missing parts and
there is no visible damage.
6
Manuals
▪
Ensure a copy of operating manual, and other
important documents are enclosed in manual
storage box.
1.
Check to be sure manual storage box is
present and in good condition.
2.
Ensure manuals are legible and in good
condition.
3.
Always return manuals to the manual storage
box after use.
4
2
3
1
1
5
6
5
Summary of Contents for 213217AAA
Page 1: ...OPERATING MANUAL SJ85 AJ ARTICULATING BOOMS 213217AAA December 2018 ANSI CSA...
Page 4: ...213217AAA SJ85 AJ 4 Notes...
Page 14: ...213217AAA SJ85 AJ 14 Notes...
Page 20: ...213217AAA SJ85 AJ 20 Notes...
Page 38: ...213217AAA SJ85 AJ 38 Notes...
Page 75: ...SJ85 AJ 213217AAA 75 Section 7 Technical Diagrams Specifications...
Page 110: ...213217AAA SJ85 AJ 110 Notes...
Page 111: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING...
Page 112: ...www skyjack com...