Visual & Daily Maintenance Inspections
Section 4 – Pre-operation
4.2-9 Boom assembly
1
Load cell
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all bolts are properly tightened.
▪
Ensure all cables are secure and are in proper
working condition.
▪
Ensure debris is not lodged between the
platform and boom adaptor.
2
Rotary actuator
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all bolts and pins are properly
tightened.
▪
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
3
Jib
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all bolts and pins are properly
tightened.
▪
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
4
E-chain
▪
Ensure there are no loose or missing parts and
there is no visible damage.
5
Cylinders
▪
Ensure all cylinders are properly secured and
there is no evidence of leakage.
6
Wear pads
▪
Ensure all bolts are tight, there is no visible
damage to the wear pads and that no parts
are missing.
7
Boom
▪
Ensure there are no loose or missing parts and
there is no visible damage.
▪
Ensure all bolts and pins are properly
tightened.
▪
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
Hoses
▪
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
2
1
3
4
5
7
6
6
Summary of Contents for 213217AAA
Page 1: ...OPERATING MANUAL SJ85 AJ ARTICULATING BOOMS 213217AAA December 2018 ANSI CSA...
Page 4: ...213217AAA SJ85 AJ 4 Notes...
Page 14: ...213217AAA SJ85 AJ 14 Notes...
Page 20: ...213217AAA SJ85 AJ 20 Notes...
Page 38: ...213217AAA SJ85 AJ 38 Notes...
Page 75: ...SJ85 AJ 213217AAA 75 Section 7 Technical Diagrams Specifications...
Page 110: ...213217AAA SJ85 AJ 110 Notes...
Page 111: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING...
Page 112: ...www skyjack com...