6
Installation
User Manual
HB80-2
Unpacking
Remove all packing material from the inside and outside the cabinet,
including the foam base and all adhesive tape holding the cabinet
accessories.
Shelves
The cabinet is supplied with two shelves. Remove the packing material, then
position the shelves into the cabinet at the desired heights. The bottom shelf
has hooks on the back which lock the shelf in position.
Positioning
Climate Class
The chiller is designed to operate safely within a climatic class 5
environment (40°C @ 40% relative humidity). To ensure correct operation
and efficient operation, the maximum ambient temperature at the place of
installation should not exceed 32°C.
Power Supply
The cabinet is supplied with a power cord fitted with a 3-pin plug, which exits
behind the refrigeration system. Retrieve the power cord before positioning
the cabinet. Ensure the power supply can be easily accessed once the
cabinet is positioned so the cabinet can be disconnected from the power
supply for cleaning and maintenance.
Ventilation
Ensure adequate ventilation is provided around the cabinet. Do not place
the cabinet in a recess or enclose it in another cabinet. It is designed for
free
-
standing installation only. The recommended clearance on both sides
and at the back of the cabinet is 50mm.
Location
When positioning the cabinet:
Avoid direct sunlight, warm draughts etc.
Allow adequate space for the door to open fully.
Ensure the cabinet is positioned on a level surface so the door shuts
and seals correctly, and to prevent the condensate tray from
overflowing.
Levelling
This cabinet has a stabiliser foot located underneath the door hinge. After
final positioning, the stabiliser foot should be screwed firmly down to floor
level to stabilise the cabinet. Turn the stabiliser foot clockwise to raise the
cabinet or anti-clockwise to lower the cabinet.
Shelves