© 2018 Skier’s Choice, Inc.
93
U
NLOADING
P
ROCEDURE
To unload the boat use the following procedure as a guide:
1. Make sure that all drain plugs are securely in place.
2. Unplug light cord before backing into the water.
3. With Bow Eye Hook fastened, back the trailer until the water
level is approximately one inch below the top of the trailer
fenders.
4. Follow the cold start procedure recommended in this
manual.
5. After starting engine, unlatch Bow Eye Hook to ensure the
boat will release from the trailer.
6. With engine idling, center the steering wheel, engage the
transmission into reverse (pull back on lever,) then ease back
on the throttle.
NOTE: Because your Moomba is a true inboard, when backing
the stern will have a tendency to drift left or right depending on
propeller rotation. This condition will self-correct as the rudder
reaches control speed.
NOTE: Ramp slopes vary, so actual level of water on trailer
may be different.
NOTE: DO NOT attempt to use excessive power to free the
boat from dry carpet runners. Power off of the trailer only
when the boat has floated free.
Summary of Contents for Moomba Craz 2019
Page 1: ......
Page 2: ...2018 Skier s Choice Inc 1 WARNING...
Page 21: ...2018 Skier s Choice Inc 20 MAX MAKAI MAKAI PRO MOJO 17 Passengers 17 Passengers 18 Passengers...
Page 23: ...2018 Skier s Choice Inc 22...
Page 24: ...2018 Skier s Choice Inc 23...
Page 25: ...2018 Skier s Choice Inc 24...