12
SKF TKBA 10 & 20
Figure 8 Parallel misalignment as found and after correction
If Steps 1, 2 and 3 are followed then the alignment of the belt drives should
be completed quickly. However, one alignment correction may affect other
alignment conditions. Steps 1, 2 and 3 may need to be repeated until the
system is completely aligned.
Good alignment is achieved when the laser lines on the transmitter and
relector units coincide with the reference lines.
Figure 9 Pulleys perfectly aligned
Note:
When tightening the belt, check the horizontal angle alignment and
adjust if necessary.
WARNING:
Switch OFF the transmitter unit and remove both units
BEFORE starting machinery.
Summary of Contents for TKBA 10
Page 2: ......
Page 3: ...English 3 Fran ais 15 Deutsch 27 Espa ol 39 Italiano 51 Portugu s 63 75 87...
Page 4: ......
Page 77: ...75 SKF TKBA 10 20 76 77 1 78 2 79 3 80 4 81 5 81 6 82 7 82 8 85 9 85...
Page 80: ...78 SKF TKBA 10 20 1 SKF TKBA 10 TKBA 20...
Page 81: ...79 SKF TKBA 10 20 2 TKBA 10 TKBA 20 A B C 1 A B C...
Page 82: ...80 SKF TKBA 10 20 3 TKBA 10 20 2 AAA LR03 2 3 2 3...
Page 83: ...81 SKF TKBA 10 20 4 TKBA 10 TKBA 20 G 4 5...
Page 84: ...82 SKF TKBA 10 20 6 7 5...
Page 85: ...83 SKF TKBA 10 20 1 SKF TMAS 6 2 7 3...
Page 86: ...84 SKF TKBA 10 20 8 1 2 3 1 2 3 9...
Page 89: ...87 SKF TKBA 10 20 EC 88 89 1 90 2 91 3 92 4 93 5 93 6 94 7 94 8 97 9 97...
Page 92: ...90 SKF TKBA 10 20 1 TKBA 10 TKBA 20...
Page 93: ...91 SKF TKBA 10 20 2 TKBA 10 TKBA 20 A 1 A...
Page 94: ...92 SKF TKBA 10 20 3 TKBA 10 20 AAA LR03 Remove to Release battery pack 2 3 2 3...
Page 95: ...93 SKF TKBA 10 20 4 TKBA 10 TKBA 20 4 5...
Page 96: ...94 SKF TKBA 10 20 6 7 5 1...
Page 97: ...95 SKF TKBA 10 20 SKF TMAS 6 2 7 3...
Page 98: ...96 SKF TKBA 10 20 8 1 2 3 1 2 3 9...
Page 101: ...99 SKF TKBA 10 20...
Page 102: ...100 SKF TKBA 10 20...
Page 103: ...101 SKF TKBA 10 20...
Page 104: ...102 SKF TKBA 10 20...
Page 105: ...103 SKF TKBA 10 20...
Page 106: ...104 SKF TKBA 10 20...
Page 107: ......