31
7
EN
7. Start-up
After correct electrical connection of the
control and power supply lines as well as the
correct connection of the tube lines com-
missioning of the EM-U3/ WS-E shall be
carried out by qualified personnel following
the start-up prescriptions of the overall
system.
7. Start-up