![SKETCHNBUILD SNB-K2A Manual Download Page 11](http://html1.mh-extra.com/html/sketchnbuild/snb-k2a/snb-k2a_manual_1286915011.webp)
SNB-K2A AUTOMATIC EDGE BANDER MANUAL
11
6/2016
Installing the edge belt reel and the edge sealing belt regulator.
1.
Put the edge sealing reel in the carrier as shown in Fig.6.
2.
Push the edge sealing belt through the leading fields (2sets) as shown in Fig.7.
Adjust the upper cover plate B (loosen the locking knob C) according to the width of
the edge sealing belt, and push it through the roller to avoid tightening the edge
sealing belt.
3.
Loosen bolt N and knob C so that base plate D and cover plate B rotate along
column E.
Note: Base plate D needs to be in its normal position, it should be 18mm
between the topside of D and the table board, and the width of the edge sealing belt may
not be more than 2 mm on each side of the work piece.
Ex:
The maximum width of the
edge sealing belt should be 22mm if the thickness of a work piece is 18mm.
4.
The edge sealing belt regulator as shown in Fig.8 consists of the base frame A, the
elastic sheet B, carrier C and adjusting screw D. Adjust the twisting screw D in
bracket C so that the edge strip produces adequate resistance between the elastic
sheet B and base frame A. Make sure it can move forward with adequate force and
can
’
t run freely in order for the edge strip to stay in position.
Mechanical Conveying of Edge Banding Belt
1.
Once the temperature of glue reaches 400
°
F, and the glue roller and edge sealing
belt roller begin to rotate, press the
“
1
”
button in column
④
as shown in Fig.5. The
edge banding process is now ready to begin.
Fig. 9
C
A
B