![SKETCHNBUILD SNB-K2A Manual Download Page 10](http://html1.mh-extra.com/html/sketchnbuild/snb-k2a/snb-k2a_manual_1286915010.webp)
SNB-K2A AUTOMATIC EDGE BANDER MANUAL
10
6/2016
START UP
1.
Make sure the work
piece conveyor safety switch is off. The emergency stop switch
⑧
should be in the
“
ON
”
position.
2.
Access to power: Turn the power key to
“
On
”
, next, turn the main switch to make
the arrowhead point to
“
1
”
, at this point, all power is on and the power
indicator(green) and digital display temperature-controlled meter should light up.
3.
Press the button
⑤
to start the conveyor, and then check the direction of
movement to make sure it corresponds to the power connection instructions above.
If not, change the position of any two of the three live lines until it runs in the
correct direction.
4.
After the conveyor runs in the right direction, turn the heating switch to
“
ON
”
, the
glue tank will start to heat up. (Caution: Do not run the machine until the
temperature reaches 400
°
F (
default factory glue temperature setting is 400
°
F)
.
5.
The machine is now ready to work
ADJUSTMENTS
Fig. 6
Fig. 7
B
E
C
N
D
Fig. 8
A
B
C
D