Molenvliet 28
3961 MV Wijk bij Duurstede
+31 343 595 400
www.sitetec.nl | [email protected]
In all cases in which we act as offerer or supplier, our offers, assignments given to us and agreements concluded with us are subject to the METAALUNIE
TERMS AND CONDITIONS. These terms and conditions have been filed at the Registry of the Rotterdam District Court. The Dutch law is applicable on all
our agreements. KVK nr. 34043947 | VAT/BTW nr. NL.0034.76.443.B01 | IBAN NL94ABNA 0565320300
1.
Before working on the unit, stop all functions and switch off the main switch
2.
Disconnect main power cable
3.
Before working on the pump close all valves and drain the pump
READ AMTEQ INSTRUCTION MANUAL TO REPLACE PARTS ON THE AMTEQ PUMP
3.1
12 HOUR SHIFT MAINTENANCE
When the mixing unit is running on a 12 hour shift, check the unit overall as described in 1.3.
3.2
24 HOUR SHIFT MAINTENANCE
When the mixing unit is running on a 24 hour shift, check the unit overall as described in 1.3. (2x in 24 hours).
3.3
WEEKLY MAINTENANCE
For weekly maintenance on the mixing unit the following activities are recommended:
1.
Check the unit overall as described in chapter 1.3
2.
Clean the complete unit including the tank
3.
Grease all nipples on the AMTEQ pump: see the AMTEQ instruction manual (use Shell RHODINA EP2)
3.4
MONTHLY MAINTENANCE
For monthly maintenance on the mixing unit the following activities are recommended:
1.
Follow all points described in weekly maintenance
2.
Remove guard from Flex tire drive and tire mount and check the condition
3.
Check impeller, seal plate and impeller housing for wear. See AMTEQ instruction manual
3.5
3 MONTH MAINTENANCE
For 3 month maintenance on the mixing unit the following activities are recommended:
1.
Follow all the points described in monthly maintenance
2.
Check mixing tank for cracks or loose welds
While working in the tank, make sure it is clean and empty.
READ AMTEQ INSTRUCTION MANUAL TO REPLACE PARTS ON THE AMTEQ PUMP