9
SITECO Connect 31 Gen2 Commissioning Instruction V1.0 262639-002
4.5
Connect the Controller to a construction area
Now add the controller to construction area.
The prerequisite is that the controller has not yet been added to a network / area.
The red "Status" LED on the controller must therefore light up red continuously.
If the "Status" LED lights up green on the controller, this has already been added to another area / network.
You can only insert this into the meeting room by deleting it.
Please set the following in the app:
The controller is now automatically inserted into the construction area. This can take up to a minute.
Summary of Contents for Connect 31
Page 8: ...7 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 ...
Page 22: ...21 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 5 2 Wiring Luminaires B ...
Page 25: ...24 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 2 Delete components ...
Page 26: ...25 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 3 Delete area ...
Page 27: ...26 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 6 4 Delete network ...
Page 32: ...31 SITECO Connect 31 Gen2 Commissioning Instruction V1 0 262639 002 ...