4
CHAP. 9 – USE OF THE MACHINE
page 15
9.1 -
STARTING
THE
MACHINE
9.1.2 - Setting the use parameters
9.1.3 - Sealing
–
procedure
CHAP. 10 – ISSUES AND SOLUTIONS
page 18
10.1. - POSSIBLE
ERRORS
CHAP. 11 – ROUTINE CLEANING
page 18
11.1 - GENERALS
11.2 - CLEANING OF THE MACHINE
CHAP. 12 - DISMANTLING
page 19
12.1 - DECOMMISSIONING
12.2 - WEEE WASTE ELECTRICAL AND ELECTRONIC
EQUIPMENT
LEVELS
17
RUN 2.3 175°
0006
4. Lower the welding head until it closes
completely, after hearing a “beep”
signal the sealing procedure starts for
the duration previously set (
Fig. n°31
).
5. The display will show the machine
status on “RUN” mode as well as the
elapsed seconds of the cycle (
Fig. n°
31
).
6. Upon reaching the sealing time set,
you will hear two consecutive “beeps”
warning that the operation has been
completed.
7. Shall the welding head be open before
the completion of the sealing, it will
emit a series of fast “beep” signals to
warn that the operation has not been
completed. It is recommended to
repeat the operation.
8. Lift the welding head.
9. Pull out the tray by hand in the side
openings (
Fig. n°32
)
ATTENTION
do
not touch the welding plate.
10.Now, it is possible to carry out a new
cycle.
Fig. n°31
Fig. n°32
3. Pull the film correctly above the tray to seal (
Fig. n°29-30
).
PAY ATTENTION to the knife for the cut of the film!
Fig. n°29
Fig. n°30