5
Guide to Installation, Programming & Operating
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
06/29
/1
7
FR
12
:15
SEL
SEL
06/29/17 FR
12:15
SEL
06/29/
17
FR
12:15
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
GUIDE TO INSTALLING ON BOTTLELESS WATER COOLER
STEPS TO INSTALLING ON BOTTLELESS WATER COOLER
1.
Make sure unit power is unplugged from
socket.
2.
Remove the cap from the units drain line.
3.
Drain unit reservoir completely.
4.
Locate and remove the units locking screws
from the top lid.
5.
Remove the units top lid.
6.
Remove the units cold water Reservoir Lid.
7.
Remove the units Baffle.
8.
Drill a 9/32” hole into the top of the units
Reservoir Lid.
9.
Locate the Neo
3
s Down Rod, making sure
the rubber Grommet is in place.
10.
Place the Down Rod through the previously
drilled 9/32” hole, then secure the Down Rod
to the Reservoir Lid with the rubber
Grommet.
11.
Place the Down Rod into a free port on the
Baffle.
12.
Measure the distance from hole to bottom
of Reservoir and cut Down Rod to size that
will
accommodate connecting the Diffuser to
it using a small piece of silicon tubing.
13.
Connect the Down Rod and the Diffuser with
the ¼” tubing.
14.
Replace Reservoir Lid on cold water
Reservoir.
15.
Cut your desired length of ¼”tubing for the
Neo
3
, then connect the first side of the
tubing to the inlet of the Down Rod.
16.
Take the ¼” tubing connected to the Down
Rod and run through the back grate of the
unit.
17.
Replace the units Reservoir Lid and locking
screws.
18.
Take the ¼” tubing connected to the Down
Rod and connect it to the outlet of the Neo
3
.
19.
Connect both Neo
3
Housings with the 12
Volt Connector Cable.
20.
Connect the Neo
3
and Unit power supplies
to the appropriate ports below the Neo
3
Master Housing.
21.
Use the Neo
3
’s Mounting Tabs to mount the
Neo
3
on back of the unit.
22.
Plug the unit back in and turn it on.