background image

5

Guide to Installation, Programming & Operating

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

06/29

/1

 FR

12

:15

SEL

SEL

06/29/17  FR

12:15

SEL

06/29/

17  

FR

12:15

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

×

GUIDE TO INSTALLING ON BOTTLELESS WATER COOLER

STEPS TO INSTALLING ON BOTTLELESS WATER COOLER

1. 

Make sure unit power is unplugged from 

 socket.
2. 

Remove the cap from the units drain line.

3. 

Drain unit reservoir completely.

4. 

Locate and remove the units locking screws 

 

from the top lid.

5. 

Remove the units top lid.

6. 

Remove the units cold water Reservoir Lid.

7. 

Remove the units Baffle.

8. 

Drill a 9/32” hole into the top of the units  

 

Reservoir Lid.

9. 

Locate the Neo

3

s Down Rod, making sure 

 

the rubber Grommet is in place.

10. 

Place the Down Rod through the previously 

 

drilled 9/32” hole, then secure the Down Rod 

 

to the Reservoir Lid with the rubber 

 Grommet.
11. 

Place the Down Rod into a free port on the 

 

Baffle.

12. 

Measure the distance from hole to bottom 

 

of Reservoir and cut Down Rod to size that 

 will 

accommodate connecting the Diffuser to 

 

it using a small piece of silicon tubing.

13. 

Connect the Down Rod and the Diffuser with 

 

the ¼” tubing.

14. 

Replace Reservoir Lid on cold water 

 Reservoir.

15. 

Cut your desired length of ¼”tubing for the 

 Neo

3

, then connect the first side of the 

 

tubing to the inlet of the Down Rod.

16. 

Take the ¼” tubing connected to the Down 

 

Rod and run through the back grate of the 

 unit.
17. 

Replace the units Reservoir Lid and locking 

 screws.
18. 

Take the  ¼” tubing connected to the Down 

 

Rod and connect it to the outlet of the Neo

3

.

19. 

Connect both Neo

3

 Housings with the 12 

 

Volt Connector Cable.

20. 

Connect the Neo

3

 and Unit power supplies 

 

to the appropriate ports below the Neo

3

 

 

Master Housing.

21. 

Use the Neo

3

’s Mounting Tabs to mount the 

 Neo

3

 on back of the unit.

22. 

Plug the unit back in and turn it on.

Summary of Contents for Neo3

Page 1: ...N OPERATION PROGRAMMING SEL COPYRIGHT 2017 SIP TECHNOLOGIES LLC ALL RIGHTS RESERVED SIP AND THE SIP LOGO ARE TRADEMARKS OF SIP TECHNOLOGIES LLC REGISTERED IN THE U S AND OTHER COUNTRIES GUIDE TO INSTALLATION PROGRAMMING OPERATION UK VERSION ...

Page 2: ...concealed damages If content appears damaged ask driver or contact the carrier for damage claim form to fill out Notify shipper immediately Remove components from the shipping carton Check that all installation parts and hardware are present Make complete inspection of the SIP NEO3 system to ensure that a There is no physical damage to the system b All accessories are present Intended for indoor u...

Page 3: ...ack of the dispenser using zip ties to secure ozone generating device and control system device onto the back of cooler s condenser or the grids or on the wall at the back of dispenser Control Device System should be installed to the right of the Ozone Generating Device HOW TO INSTALL OZONE GENERATING DEVICE AND CONTROL SYSTEM DEVICE WHERE TO PLUG IN POWER CORDS FIG 1 NEO3 COMPONENT CHART Plug the...

Page 4: ...m hole to bottom of Reservoir and cut Down Rod to size that will accommodate connecting the Diffuser to it using a small piece of silicon tubing 15 Connect the Down Rod and the Diffuser with the tubing 16 Drill or cut a 9 32 hole into the side of the Insulation Jacket then place it back on the Reservoir Tank 17 Replace the Baffle with attached Down Rod then secure Down Rod through the Reservoir Ta...

Page 5: ...et 11 Place the Down Rod into a free port on the Baffle 12 Measure the distance from hole to bottom of Reservoir and cut Down Rod to size that will accommodate connecting the Diffuser to it using a small piece of silicon tubing 13 Connect the Down Rod and the Diffuser with the tubing 14 Replace Reservoir Lid on cold water Reservoir 15 Cut your desired length of tubing for the Neo3 then connect the...

Page 6: ...s used in the SIP NEO3 LCD display panel indicates O3 Ozone Generator AP Air Pump CO Dispenser Compressor When O3 is displayed then you are programming the ozone operation Likewise the air pump and compressor water dispenser symbols indicate that you are programming the operation of these functions When O3 is programmed the AP is automatically programmed to turn on at the same time It stays on for...

Page 7: ...de a blinking cursor will appear on the first input of that screen use previously defined procedure Edit Mode SEL key SEL key SEL key SEL key SEL key Set 03 Program 1 SEL edit UP skip 03 1 ON 04 00 03 1 DUR 10 mins Set Compressor SEL edit UP skip CMP MO FR 07 00 20 30 Set 03 Program 2 SEL edit UP skip 03 2 ON 20 00 03 2 DUR 20 mins Set Air Pump SEL edit UP skip AP1 19 25 02m AP2 19 29 04m Set Date...

Page 8: ...SE IF SIP CANNOT LAWFULLY DISCLAIM OR EXCLUDE IMPLIED WARRANTIES UNDER APPLICABLE LAW THEN TO THE EXTENT POSSIBLE ANY CLAIMS UNDER SUCH IMPLIED WARRANTIES SHALL EXPIRE ON EXPIRATION OF THE WARRANTY PERIOD EXCEPT FOR THE WARRANTY PROVIDED HEREIN THE PRODUCT IS PROVIDED AS IS NO SIP RESELLER OR AGENT IS AUTHORIZED TO MAKE ANY MODIFICATION EXTENSION OR ADDITION TO THIS WARRANTY WITHOUT THE EXPRESSED ...

Reviews: