background image

3

Guide to Installation, Programming & Operating

WARNING

 – To guard against injury, basic safety should be observed including the following:  Read all instructions, 

specifications, cautions, and warnings before installing and using SIP NEO

3

.  Learn the specific details regarding installation and 

use.  Failure to follow them could cause serious injuries and possible property damage.

DANGER

 –  To avoid possible electrical shock, unplug dispenser prior to installation of SIP NEO

3

.  

All Power cords must be three-pin plugs to be grounded. Do not use two-pin plugs.
Power supply cord must be plugged into electrical wall outlet.  DO NOT plug into extension cord.

Do not stand on wet floor when installing and servicing the water dispenser.
Install check valve on silicone tubing prior to the diffuser to avoid water from reservoir flowing backward causing damage to 

ozone generating device.

SAFETY PRECAUTIONS

!

INSTALLATION STEPS

SIP NEO

3

 is designed to use in all brands of bottle and bottleless water coolers (dispensers). The system can be installed on the 

back of the dispenser or on the wall at the back of dispenser so as to display the indicator light and screen for proper consum-

er use.

Install to back of the dispenser using zip ties to secure ozone generating device and control system device onto the back of 

cooler’s condenser, or the grids, or on the wall at the back of dispenser. Control Device System should be installed to the right 

of the Ozone Generating Device.

HOW TO INSTALL OZONE GENERATING DEVICE AND CONTROL SYSTEM DEVICE

WHERE TO PLUG IN POWER CORDS (FIG 1)

NEO

3

 COMPONENT CHART

Plug the main power supply cord into the “POWER” receptacle (bottom of the control device system, left side). Plug the short 

power outlet cord (converter cord) into “UNIT” receptacle (bottom of the control device system, right side). Plug the water 

dispenser power cord into the opposite end of the short power outlet cord (converter cord).

Important:  

All float mechanisms are not identical and the 

optimal location of the down rod may vary depending on 

your particular float system.

SEL

06/29/17  FR

12:15

Display Screen

Diffuser 

12 Volt Connector Cable

Power Cord to Dispenser 

Power Supply Cord 

Filter Disc Port

Filter Hatch

Check Valve

Silicone Tube   

Mounting Tab

Indicator Light

Fuse

A

B

Power

Unit

Air Filter Disc

Cable Lock

(Fig 1)

HOW TO SECURE THE CONNECTOR:

1.    Locate the Cable Lock Cap on the side of the unit.

2.    Turn the Cap counterclockwise to loosen.

3.    Firmly insert the 12 Volt Connector Cable into the 

       Connector Cable terminal.

4.    Turn the Cap clockwise to tighten, being careful not to 

       overtighten.

Summary of Contents for Neo3

Page 1: ...N OPERATION PROGRAMMING SEL COPYRIGHT 2017 SIP TECHNOLOGIES LLC ALL RIGHTS RESERVED SIP AND THE SIP LOGO ARE TRADEMARKS OF SIP TECHNOLOGIES LLC REGISTERED IN THE U S AND OTHER COUNTRIES GUIDE TO INSTALLATION PROGRAMMING OPERATION UK VERSION ...

Page 2: ...concealed damages If content appears damaged ask driver or contact the carrier for damage claim form to fill out Notify shipper immediately Remove components from the shipping carton Check that all installation parts and hardware are present Make complete inspection of the SIP NEO3 system to ensure that a There is no physical damage to the system b All accessories are present Intended for indoor u...

Page 3: ...ack of the dispenser using zip ties to secure ozone generating device and control system device onto the back of cooler s condenser or the grids or on the wall at the back of dispenser Control Device System should be installed to the right of the Ozone Generating Device HOW TO INSTALL OZONE GENERATING DEVICE AND CONTROL SYSTEM DEVICE WHERE TO PLUG IN POWER CORDS FIG 1 NEO3 COMPONENT CHART Plug the...

Page 4: ...m hole to bottom of Reservoir and cut Down Rod to size that will accommodate connecting the Diffuser to it using a small piece of silicon tubing 15 Connect the Down Rod and the Diffuser with the tubing 16 Drill or cut a 9 32 hole into the side of the Insulation Jacket then place it back on the Reservoir Tank 17 Replace the Baffle with attached Down Rod then secure Down Rod through the Reservoir Ta...

Page 5: ...et 11 Place the Down Rod into a free port on the Baffle 12 Measure the distance from hole to bottom of Reservoir and cut Down Rod to size that will accommodate connecting the Diffuser to it using a small piece of silicon tubing 13 Connect the Down Rod and the Diffuser with the tubing 14 Replace Reservoir Lid on cold water Reservoir 15 Cut your desired length of tubing for the Neo3 then connect the...

Page 6: ...s used in the SIP NEO3 LCD display panel indicates O3 Ozone Generator AP Air Pump CO Dispenser Compressor When O3 is displayed then you are programming the ozone operation Likewise the air pump and compressor water dispenser symbols indicate that you are programming the operation of these functions When O3 is programmed the AP is automatically programmed to turn on at the same time It stays on for...

Page 7: ...de a blinking cursor will appear on the first input of that screen use previously defined procedure Edit Mode SEL key SEL key SEL key SEL key SEL key Set 03 Program 1 SEL edit UP skip 03 1 ON 04 00 03 1 DUR 10 mins Set Compressor SEL edit UP skip CMP MO FR 07 00 20 30 Set 03 Program 2 SEL edit UP skip 03 2 ON 20 00 03 2 DUR 20 mins Set Air Pump SEL edit UP skip AP1 19 25 02m AP2 19 29 04m Set Date...

Page 8: ...SE IF SIP CANNOT LAWFULLY DISCLAIM OR EXCLUDE IMPLIED WARRANTIES UNDER APPLICABLE LAW THEN TO THE EXTENT POSSIBLE ANY CLAIMS UNDER SUCH IMPLIED WARRANTIES SHALL EXPIRE ON EXPIRATION OF THE WARRANTY PERIOD EXCEPT FOR THE WARRANTY PROVIDED HEREIN THE PRODUCT IS PROVIDED AS IS NO SIP RESELLER OR AGENT IS AUTHORIZED TO MAKE ANY MODIFICATION EXTENSION OR ADDITION TO THIS WARRANTY WITHOUT THE EXPRESSED ...

Reviews: