Maintenance

 

 

Bolts 

- Check bolts regularly for correct tightness. Bolts should be tightened

 

 

  Firmly so that they do not slop around in bolt holes, but should not be 
  over-tightened to cause restrictive movement of parts. Worn bolts 
  should be replaced immediately. 
 

Cylinder 

- Keep top and lower plunger rods clean of dirt or other foreign 
  substances to assure smooth operation of cylinder. 
 
- Make sure all threaded connections are tight to assure smooth 
  operation of cylinder. 
 
- Replace seals, wipers, and O-rings if cylinder is leaking oil. 
 
- Lubricate top plunger rod where rod enters top reservoir with an 
  aerosol type lubricant. 
 
- It is recommended when head gate is not in use to fully open doors. 
  This will place the bottom plunger into the cylinder protecting it 
  from the elements. 
 
- Change to oil in the cylinder every 4 years or as needed. 
 
- Any cylinder malfunction should be immediately reported to your 
  dealer or Sioux Steel. 
 

Procedure for Changing Oil 

1)  Using Mobil DTE 24 Excel 31 (10W) Shell AW36 or AW46 

Oil, measure and set aside 11 ozs. of oil. 

2)  Remove cylinder from head gate. 
3)  Remove cylinder actuator and drain oil from the top reservoir. 
4)  Carefully remove the cylinder rod and drain oil from the 

bottom reservoir. 

5)  Remove the bottom reservoir from the cylinder lock. 
6)  Re-install cylinder rod into bottom reservoir, leaving 

approximately 9-1/2” of cylinder rod exposed. 

7)  Fill bottom reservoir with approximately 9 ozs of oil or until 

the fluid level just meets the start of the threads within the 
bottom reservoir. 

8)  Re-install the bottom reservoir onto the cylinder body and 

Tighten to 85 ft/lbs. 

9)  Pour remaining oil into top reservoir of the cylinder body. 
10) Re-install cylinder actuator with spring into the top reservoir. 
11) Slowly actuate the cylinder to remove air from the bottom  

reservoir. Continue until the cylinder effectively locks. 

12) Re-install cylinder onto head gate. 
13) Before operation of head gate, cycle the head gate at least 10 times, ensuring to stop for 5 

seconds between opening and closing AND each cycle. Then with the head gate closed, 

Cylinder 
Actuator 

Top 

Reservoir 

Cylinder 

Lock 

Bottom 

Reservoir 

Cylinder 

Rod 

Summary of Contents for S202800

Page 1: ...VIDED BREATHER VENT INTO THE TOP CHAMBER OF THE CYLINDER FAILURE TO DO SO CAN RESULT IN INCONSITENT PERFORMANCE IF BREATHER IS ALREADY INSTALLED DISREGARD AND CONTINUE READING OPERATORS MANUAL FOR PRO...

Page 2: ...2...

Page 3: ...2 19 ECN 19 044 Manual Head Gate S202800 LH S208753 RH Left Handed Version Depicted WARNING Keep hands and fingers away from all hinged and moving parts during operation Sioux Steel Company P O Box 12...

Page 4: ...FORMATION PG 6 PARTS LIST BREAKDOWN LH PG 7 9 PARTS LIST BREAKDOWN RH PG 10 12 ASSEMBLY CYLINDER PG 13 HEAD GATE SET UP PG 14 MAINTENANCE PG 15 TROUBLESHOOTING PG 16 HEAD GATE OPERATION PG 17 WARRANTY...

Page 5: ...perators It is important that all operators be familiar with and follows safety precautions Improper use of equipment can cause serious injury or death 1 Read the operator s manual before operating eq...

Page 6: ...oved from head gate Grease the 4 grease zerks found on the linkage rod ends Oil all other hinged and moving parts Before operation of head gate cycle the head gate at least 10 times ensuring to stop f...

Page 7: ...3 14 S208767 Spacer 1 15 S202726 Short Link Ass y 1 16 S202727 Long Link Ass y 1 17 S208499PG Frame LH 1 18 S201299 Cylinder 1 19 S202789P Pivot Spacer 1 20 S202739 Shoulder Bolt 1 21 K699010 Flange...

Page 8: ...8 See next page for linkage breakdown and details Front View showing short linkage connection...

Page 9: ...9 Rear View of Doors showing short linkage connection...

Page 10: ...e 3 14 S208767 Spacer 1 15 S202726 Short Link Ass y 1 16 S202727 Long Link Ass y 1 17 S208746PG Frame RH 1 18 S201299 Cylinder 1 19 S202789P Pivot Spacer 1 20 S202739 Shoulder Bolt 1 21 K699010 Flange...

Page 11: ...11 See next page for linkage breakdown and details Front View showing short Linkage connection...

Page 12: ...12 Rear View of Doors showing short linkage connection...

Page 13: ...pler 1 7 K194518 Cyl Spring Stop 1 8 K194519 1 3 16 Snap Ring 1 9 K696085 Bearing Ball 1 10 K696086 Conical Spring 1 11 K195857 220 O Ring 3 12 K194527 Cyl Rod 1 13 K194535 Spring Compression 1 14 K19...

Page 14: ...provided breather plug into the top chamber of the cylinder If breather is already installed disregard and proceed to next step Before operation of head gate cycle the head gate at least 10 times ens...

Page 15: ...cel 31 10W Shell AW36 or AW46 Oil measure and set aside 11 ozs of oil 2 Remove cylinder from head gate 3 Remove cylinder actuator and drain oil from the top reservoir 4 Carefully remove the cylinder r...

Page 16: ...a Top plunger may be stuck Lubricate top plunger rod where rod enters top reservoir with an aerosol type lubricant b Verify cap and jam nut on top plunger are tight and set at proper setting to preve...

Page 17: ...ort it may be necessary to give a sharp pull on the handle Operation Open Head Gate Close Head Gate Optional Handle Storage Position Safety Chain Pull Handle Down to Close Head Doors Push Handle Up To...

Page 18: ...18...

Page 19: ...hinder the functionality of the Products E LIFETIME GUARANTEED GATES The Limited Warranty for New Sioux Steel Company Products shall apply to the Lifetime Guaranteed Gates Gates for the life of the or...

Page 20: ...tom See Figure 1 6 Cycle the head gate 10 times ensuring to stop for 5 seconds between opening and closing AND each cycle 7 Close head gate and manually pull open Then measure gap at the top The gap c...

Page 21: ...21...