background image

10 

 

 
 

S208753 RH Manual Head Gate Part List 

 

Item 

No 

Part Number 

Description 

Qty 

S208761PG 

Door- Cyl Side/RH 

S208762PG 

Door- Non-Cyl Side RH 

S194471 

Wheel 

S202736 

Pivot Pin 

S208755B 

Actuator Arm/RH 

S202796 

Driver Plate 

S202797 

Arm Plate 

S202798 

Linkage Arm 

S208757PGBRG 

Handle Receiver/RH 

10 

S208759RD 

Handle Weldment/RH 

11 

S202792 

.875 Pivot Pin 

12 

S202794 

Extension Spring 

13 

S202790P 

Spacer Plate 

14 

S208767 

Spacer 

15 

S202726 

Short Link Ass’y 

16 

S202727 

Long Link Ass’y 

17 

S208746PG 

Frame/RH 

18 

S201299 

Cylinder 

19 

S202789P 

Pivot Spacer 

20 

S202739 

Shoulder Bolt 

21 

K699010 

Flange Nut- ½” Center Lock 

22 

S178721 

Nut- 5/8” Center Lock 

23 

S208485 

Flange Nut- 3/4” Center Lock 

24 

S154109 

Cotter Pin 

25 

S184939 

Washer- ½” 

13 

26 

K679701 

Clevis Pin 

27 

S164174 

1/2-“ x 2” Hex Bolt 

28 

S198728 

½” x 2 ½” Hex Bolt 

29 

S155728 

Nut- ½” Center Lock 

30 

S208657 

7/8” Snap Ring 

31 

S195827 

Warning Decal Pinch Point 

32 

S195828 

Warning Decal Pinch Point 

33 

S195367 

Serial Number Decal 

34 

S173803 

Sioux Decal 

35 

S191528 

Handle Grip 

 
 
 
 
 
 
 
 
 
 

Summary of Contents for S202800

Page 1: ...VIDED BREATHER VENT INTO THE TOP CHAMBER OF THE CYLINDER FAILURE TO DO SO CAN RESULT IN INCONSITENT PERFORMANCE IF BREATHER IS ALREADY INSTALLED DISREGARD AND CONTINUE READING OPERATORS MANUAL FOR PRO...

Page 2: ...2...

Page 3: ...2 19 ECN 19 044 Manual Head Gate S202800 LH S208753 RH Left Handed Version Depicted WARNING Keep hands and fingers away from all hinged and moving parts during operation Sioux Steel Company P O Box 12...

Page 4: ...FORMATION PG 6 PARTS LIST BREAKDOWN LH PG 7 9 PARTS LIST BREAKDOWN RH PG 10 12 ASSEMBLY CYLINDER PG 13 HEAD GATE SET UP PG 14 MAINTENANCE PG 15 TROUBLESHOOTING PG 16 HEAD GATE OPERATION PG 17 WARRANTY...

Page 5: ...perators It is important that all operators be familiar with and follows safety precautions Improper use of equipment can cause serious injury or death 1 Read the operator s manual before operating eq...

Page 6: ...oved from head gate Grease the 4 grease zerks found on the linkage rod ends Oil all other hinged and moving parts Before operation of head gate cycle the head gate at least 10 times ensuring to stop f...

Page 7: ...3 14 S208767 Spacer 1 15 S202726 Short Link Ass y 1 16 S202727 Long Link Ass y 1 17 S208499PG Frame LH 1 18 S201299 Cylinder 1 19 S202789P Pivot Spacer 1 20 S202739 Shoulder Bolt 1 21 K699010 Flange...

Page 8: ...8 See next page for linkage breakdown and details Front View showing short linkage connection...

Page 9: ...9 Rear View of Doors showing short linkage connection...

Page 10: ...e 3 14 S208767 Spacer 1 15 S202726 Short Link Ass y 1 16 S202727 Long Link Ass y 1 17 S208746PG Frame RH 1 18 S201299 Cylinder 1 19 S202789P Pivot Spacer 1 20 S202739 Shoulder Bolt 1 21 K699010 Flange...

Page 11: ...11 See next page for linkage breakdown and details Front View showing short Linkage connection...

Page 12: ...12 Rear View of Doors showing short linkage connection...

Page 13: ...pler 1 7 K194518 Cyl Spring Stop 1 8 K194519 1 3 16 Snap Ring 1 9 K696085 Bearing Ball 1 10 K696086 Conical Spring 1 11 K195857 220 O Ring 3 12 K194527 Cyl Rod 1 13 K194535 Spring Compression 1 14 K19...

Page 14: ...provided breather plug into the top chamber of the cylinder If breather is already installed disregard and proceed to next step Before operation of head gate cycle the head gate at least 10 times ens...

Page 15: ...cel 31 10W Shell AW36 or AW46 Oil measure and set aside 11 ozs of oil 2 Remove cylinder from head gate 3 Remove cylinder actuator and drain oil from the top reservoir 4 Carefully remove the cylinder r...

Page 16: ...a Top plunger may be stuck Lubricate top plunger rod where rod enters top reservoir with an aerosol type lubricant b Verify cap and jam nut on top plunger are tight and set at proper setting to preve...

Page 17: ...ort it may be necessary to give a sharp pull on the handle Operation Open Head Gate Close Head Gate Optional Handle Storage Position Safety Chain Pull Handle Down to Close Head Doors Push Handle Up To...

Page 18: ...18...

Page 19: ...hinder the functionality of the Products E LIFETIME GUARANTEED GATES The Limited Warranty for New Sioux Steel Company Products shall apply to the Lifetime Guaranteed Gates Gates for the life of the or...

Page 20: ...tom See Figure 1 6 Cycle the head gate 10 times ensuring to stop for 5 seconds between opening and closing AND each cycle 7 Close head gate and manually pull open Then measure gap at the top The gap c...

Page 21: ...21...

Reviews: