Page 7
6. Operation Introduction
Before starting operations in this section:
1) Find a place where there is power supply nearby.
2) As shown in Fig.5 and Fig.5a, install the exhaust hose, and adjust the window position well.
Fig.5
Fig.5a
3) As shown in Fig. 6, Connect drain hose well (only for using heating model)
;
4) Insert the power cord into an grounded
AC115V/60Hz
socket;
5)
Press the POWER button to turn on the air-conditioner.
Fig.6
6. Operation Introduction
Summary of Contents for SLK-KY018-12KC/E
Page 6: ......