
52
2) Installation
Note:
To differentiate each centralized controller, the controllers in the same RS-485 net should be with
different address with each other.
NOTE:
1.
Never turn screws too tightly, otherwise the cover would be dented, or the Liquid Crystal would be broken.
2.
Do not cut wires when installing the cover of Central Control Monitor.
Summary of Contents for ASE-120AH
Page 1: ...SERVICE MANUAL ASE 76AH ASE 96AH ASE 120AH CONDENSING UNITS ...
Page 2: ......
Page 11: ...8 2 Dimension Units mm 2 1 ASE 76AH ASE 96AH ...
Page 12: ...9 2 2 ASE 120AH ...
Page 18: ...15 8 1 ASE 76AH 8 Exploded View ...
Page 20: ...17 8 2 ASE 96AH ...
Page 22: ...19 8 3 ASE AH ...
Page 51: ...48 ...
Page 52: ...49 Part 4 Control 1 Central Control Monitor Optional 50 ...
Page 53: ...50 1 HQWUDO RQWURO 0RQLWRU 2SWLRQDO 0 1 2YHUYLHZ XWWRQV DQG XQFWLRQV ...
Page 54: ...51 Liquid Crystal Display ...