Simpson 385-3L Operator'S Manual Download Page 11

11

To obtain replacement parts, address order to the nearest Authorized Ser-
vice Center. Refer to paragraph 2.2. for ordering instructions.

Table 5-1.  Replacement Parts List

Ref. Sym.

Description

Part No.

R1

Resistor, 57.7k

0.5%

1-119734

R2,R3

Resistor, 7.56k

1%

1-119735

R4

Resistor, 9.25k

1%

1-119736

R5

Resistor, 5.1k

5%

5-119351

R6

Resistor, 3.31k

0.5%

6-114951

R7

Potentiometer, 50k

20%

6-114974

S1

Switch, Probe Selector

6-114965

S2

Switch, Function Selector

6-114966

M1

Meter, 0-50 DC µA

10-865868

Knob Function  & Probe Selector

3-260180

Set Screw, Knob

1-114178

Figure 5-1. Wiring Diagram

NOTES:
Unless specified, resistors are in Ohms
Switches show in extreme counter clockwise
SW1 Probe selector
SW2 Function selector

+

 ¯

+

¯

B1

1.5V

2

3

7

8

9

1

2

3

C

SW2

A

SW1

R3

7560

5100

50K

9250

R2
7560

R4

R7

R5

R1
57.7K

M1

50

A

R6

3310

2100

A

1

Summary of Contents for 385-3L

Page 1: ...Model 385 3L V2 Temperature Tester OPERATOR S MANUAL...

Page 2: ...hnical Support or Customer Service at 847 697 2260 Internet http www simpsonelectric com Warranty and Returns SIMPSON ELECTRIC COMPANY warrants each instrument and other articles manufactured by it to...

Page 3: ...5 NOTE The proper measuring instrument for the measurement of leakage current consists essentially of a network of a 1500 ohm non inductive resistor shunted by a 0 15 microfarad capacitor connected be...

Page 4: ...ction 6 2 2 Warranty 6 2 3 Shipping 6 2 4 Operation Instructions 6 3 CONTROLS CONNECTORS INDICATORS 7 3 1 Front Panel 7 4 OPERATION 8 4 1 Safety Precautions 8 4 2 Test Probes 8 4 3 Preparation For Use...

Page 5: ...s information is flagged by CAUTION or WARNING symbols throughout this publication and is defined on the inside front cover of this manual under SAFETY SYMBOLS Adhere to these instructions in order to...

Page 6: ...ompany warranty policy is printed on the inside front cover of this manual Read it carefully before requesting a warranty repair For all assistance including help with the Instrument under warranty co...

Page 7: ...anel Front Table 3 1 Controls Connectors Indicators 1 Zero Adjusting Screw If pointer is off zero adjust screw slowly clock wise or counter clockwise until the pointer is exactly over the black diamon...

Page 8: ...sistor may result in a capacitor retaining a dangerous charge Turn off power and discharge all capacitors before connecting or disconnecting test leads to and from the circuit being measured 4 Hands s...

Page 9: ...sired 2 When measuring air temperature allow several minutes for the tempera ture of the probe sensing element to stabilize before taking a reading Liquid temperatures can be read within a few seconds...

Page 10: ...urn the slotted adjusting control below the Simpson logo until the meter indicates 32o F exactly 5 Turn the function switch to the ADJ position The meter should still indi cate 32o F 5 3 Care 1 Immedi...

Page 11: ...1k 5 5 119351 R6 Resistor 3 31k 0 5 6 114951 R7 Potentiometer 50k 20 6 114974 S1 Switch Probe Selector 6 114965 S2 Switch Function Selector 6 114966 M1 Meter 0 50 DC A 10 865868 Knob Function Probe Se...

Page 12: ...12 SIMPSON ELECTRIC COMPANY 853 Dundee Avenue Elgin IL 60120 3090 847 697 2260 FAX 847 697 2272 Printed in U S A Part No 06 114985 Edition 4 10 02 Visit us on the web at www simpsonelectric com...

Reviews: