a. Connect the Tx and Rx antenna cables to their respective connectors.
16. Ensuring that the mains power source is switched off, connect the mains power
cable from the IEC connector to the power source.
17. Carry out the configuration of the SDB670 in accordance with Section 3 –
Configuration of New Tier II Base Station or Section 4 – Configuration of New
Tier III Base Station as appropriate.
Doc Number:
TNM-I-E-0041 Revision 1.6
Page
31