Provision should be made for bringing the antenna feeder(s), IP cables, station earth
and the AC and/or DC supply leads to the installation. These cables must be firmly
anchored, in accordance with good installation practice and comply with all local
mandatory wiring requirements.
WALL MOUNT
When installing the wall mount unit, it is essential that the vertical surface chosen for
the positioning of the equipment is of a solid construction as the weight of the
SDB670 Base Station can be as much as 10 kg when fully equipped.
Doc Number:
TNM-I-E-0041 Revision 1.6
Page
20