background image

SOLIDA EV - 

ENGLISH

INDEX

MAIN WARNINGS............................................................................................................................................ .

.34

.

SUPPLY........................................................................................................................................................... .

.34

DIMENSIONAL TECHNICAL CHARACTERISTICS........................................................................................... .

.35

3.1.

DESCRIPTION

3.2.

OVERALL.DIMENSIONS

3.3.

TECHNICAL.DATA

3.4.

PRESSURE.DROP

INSTALLATION................................................................................................................................................ .

37

4.1.

BOILER.ROOM

4.2.

CONNECTION.TO.THE.CHIMNEY

4.3.

CONNECTION.TO.THE.SYSTEM

4.4.

ASSEMBLING.THE.ACCESSORIES

4.5.

ASSEMBLING.THE.CASING

4.6.

DRAUGHT.REGULATOR

4.7.

SAFETY.EXCHANGER

4.8.

HYDRAULIC.CONNECTION.DIAGRAMS

USE AND MAINTENANCE............................................................................................................................... .

41

5.1.

PRELIMINARY.CHECKS.BEFORE.COMMISSIONING

5.2.

BOILER.THERMOMETER

5.3.

AIR.ADJUSTMENT

5.4.

CLEANING

5.5.

MAINTENANCE

5.6.

DISPOSAL.OF.THE.EQUIPMENT.

Summary of Contents for SOLIDA?EV 3

Page 1: ...IME S p A Cod 6113718A 10 2018 IT PT ES ENG Gentile Cliente metta in funzione la sua nuova caldaia entro 30gg dalla data di installazione Potrà così beneficiare oltre alla garanzia legale anche della garanzia convenzionale Sime riportata in questo manuale RO RUS FR DE SL ...

Page 2: ...TION 37 4 1 BOILER ROOM 4 2 CONNECTION TO THE CHIMNEY 4 3 CONNECTION TO THE SYSTEM 4 4 ASSEMBLING THE ACCESSORIES 4 5 ASSEMBLING THE CASING 4 6 DRAUGHT REGULATOR 4 7 SAFETY EXCHANGER 4 8 HYDRAULIC CONNECTION DIAGRAMS 5 USE AND MAINTENANCE 41 5 1 PRELIMINARY CHECKS BEFORE COMMISSIONING 5 2 BOILER THERMOMETER 5 3 AIR ADJUSTMENT 5 4 CLEANING 5 5 MAINTENANCE 5 6 DISPOSAL OF THE EQUIPMENT ...

Page 3: ... and sin gle components being a potential danger for the user s safety which the company is not responsible for Maintenance of the appliance and chimney is required at least once a year 2 SUPPLY As indicated in fig 1 the boiler is supplied in two different packaging Cast iron boiler body with flue gas cham ber and adjusting dampers ash collec ting tray and draught thermostatic regu lator A bag con...

Page 4: ...I ISO 7 1 35 3 3 TECHNICAL DATA SOLIDA EV 3 4 5 6 7 Coal fired thermal output kW 23 0 34 0 45 0 56 0 67 0 Maximum power at wood kW 20 0 30 0 40 0 49 0 58 0 Wood load thermal output kW 14 0 20 5 27 5 34 0 40 0 Performance class EN 303 5 2012 1 1 1 1 1 Duration of a coal fired h 4 4 4 4 4 Duration of a wood load h 2 2 2 2 2 Load volume dm3 42 7 66 4 90 2 113 9 137 7 Minimum chimney depression mbar 0...

Page 5: ...separately SOLIDA EV 3 4 5 6 7 Kit that can be switched from class 1 to class 3 8075990 8075991 8075992 8075993 8075994 Heat capacity with wood kW 11 0 17 5 24 0 29 5 35 0 Wood load thermal output kW 8 4 13 7 19 0 23 5 28 0 Performance class EN 303 5 2012 3 3 3 3 3 Duration of a wood load h 2 2 2 2 2 Load volume dm3 37 5 58 3 79 2 100 0 120 9 Minimum chimney depression mbar 0 20 0 20 0 20 0 20 0 2...

Page 6: ...n for flues with square or rectangular sections the internal section should be higher than 10 compared to the boiler connection one The net section of the flue can be obtai ned from the following ratio S section resulting in cm2 K reduction coefficient 0 045 for wood 0 030 for carbon P boiler capacity in kcal h H height of the chimney in meters me asured from the flame axis at the exhaust of the c...

Page 7: ...peration for the handle of the ash pit port To assemble the screw with knob proceed in the following way fig 5 a Remove screw M8 x 60 that fastens the air gate damper to the ash pit port and tighten the screw with Bakelite knob 1 supplied Place the blind nut with cap 2 at the end of screw M 10 Fasten lever M6 3 to the air gate dam per placing it in a horizontal direction on the right The lever has...

Page 8: ...combustion more effectively Two types of thermostatic regulators can be assembled on the boilers 4 6 1 THERMOMAT RT C Regulator fig 7 The Thermomat regulator is equipped with a thermosetting resin knob of an adjustment field from 30 to 100 C Screw the regulator on the 3 4 opening of the anterior head and orientate the red index on the upper part The lever with the chainlet should be intro duced in...

Page 9: ...ening SC Safety exchanger F Filter CAUTION The safety exchanger is supplied in an optional kit code 8105200 01 Temperature of the water supplied to the safety heat exchanger 10 C Pressure of the water supplied to the safety heat exchanger 2 bar Assembly of the safety heat exchanger SC is mandatory Before commissioning the boiler ensure that the water flow of the thermostatic valve is guaranteed VT...

Page 10: ...imary air determines the boiler power and therefore the amount of wood that is burnt and the secondary air comple tes the combustion The optimal regulation of the SOLIDA EV operation is reached when both the boiler and chimney will be in temperature Depending on the wood used and its humi dity rotate the round port anti clockwise to open and clockwise to close so to take the flame to optimal condi...

Page 11: ...of its operating life the equipment MUST BE RECYCLED in line with current legislation IT MUST NOT be disposed of together with urban waste It can be handed over to recycling cen tres if there are any or to retailers that offer this service Recycling prevents potential damage to the environment and health It allows to recover a number of recyclable mate rials with considerable savings in terms of m...

Reviews: