41
5.1
PRELIMINARY CHECKS
BEFORE COMMISSIONING
Before. commissioning. the. boiler,. comply.
with.the.following.instructions:
–. The. system. connected. to. the. boiler.
should.be.with.open.expansion.tank.sy-
stem.(fig..9).
–. The.pipe.connecting.the.boiler.to.the..ex-
pansion. tank. must. have. a. suitable. dia-
meter.in.compliance.with.the.standards.
in.force.
–. The.heating.pump.must.always.run.du-
ring.the.boiler.operation.
–. The.operation.of.the.pump.must.never.be.
interrupted. by. an. environment. thermo-
stat.
–. If.the.system.is.equipped.with.3.or.4-way.
mixing.valve,.this.must.always.be.opened.
towards.the.system.
–. Ensure. that. the. draught. regulator. runs.
regularly.and.there.are.no.obstructions.
that.block.the.automatic.operation.of.the.
air.gate.dumper.
5.2
BOILER THERMOMETER
(fig. 11)
Indicates.the.temperature.of.the.boiler.wa-
ter.(pos..1).
5.3
AIR ADJUSTMENT (fig. 11)
The. primary. air. is. adjusted. automatically.
by. means. of. a. thermostatic. valve;. on. the.
other.hand,.the.secondary.air.is.adjusted.by.
means.of.a.round.port.placed.on.the.upper.
side.of.the.load.port.and.must.be.adjusted.
by.the.user.
At. the. first. start-up,. the. primary. and. se-
condary.air.must.be.adjusted,.considering.
that.the.primary.air.determines.the.boiler.
power.and,.therefore,.the.amount.of.wood.
that.is.burnt.and.the.secondary.air.comple-
tes.the.combustion.
The. optimal. regulation. of. the. SOLIDA EV.
operation.is.reached.when.both.the.boiler.
and.chimney.will.be.“in.temperature”.
Depending.on.the.wood.used.and.its.humi-
dity,. rotate. the. round. port. (anti-clockwise.
to.open.and.clockwise.to.close).so.to.take.
the. flame. to. optimal. conditions:. orange-
pink-white.with.a.blue.centre.
CAUTION:
Secondary air regulator with high tempe-
ratures!
Use gloves or suitable equipment to not
get burned.
5.4
CLEANING (fig. 12)
Cleaning. operations. must. be. carried. out.
frequently,. by. cleaning,. besides. the. flue.
channels,. also. the. ash-pit. port,. removing.
the.ash.in.the.collecting.tray.
For.cleaning.the.flue.channels,.use.a.spe-
cific.scraper.
5.5
MAINTENANCE
Do.not.perform.any.maintenance.work,.di-
smantling.or.removal.of.parts.without.pro-
perly.emptying.the.boiler.first..
The. boiler. must. not. be. emptied. when. the.
water.is.hot..
CAUTION: The safety valve on the system
must be inspected by technically qualified
personnel in accordance with the laws of
the country of distribution and instruc-
tions for use of the safety valve.
If the system is completely emptied and
remains unused for some time, the safety
valve must be inspected before it is used
again.
APRE
CHIUDE
1
5 USE AND MAINTENANCE
Fig..11
OPEN
CLOSES