INSTALLER INSTRUCTIONS
CONTENTS
1
DESCRIPTION OF THE BOILER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .pag. 102
2
INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .pag. 104
3
CHARACTERISTICS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .pag. 111
4
USE AND MAINTENANCE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .pag. 114
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:
– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and that the earth wire is connected to a
good earthing system.
– Open the gas tap and check the soundness of the connections, including that of the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been pro-
perly installed.
– Make sure that any shutoff valves are open.
– Make sure that the system is charged with water and is thoroughly vented.
– Check that the circulating pump is not locked.
– Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the
gas valve inlet.
FONDERIE SIME S.p.A.
of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the
CE mark under Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of
110°C,
are not subject
to application of PED Directive 97/23/CEE as they meet the requirements of article 1
paragraph 3.6 of the Directive.
PL
ANET
DEWY
60
BFR - EN
GLISH
Planet Dewy 60 BFR:
Gas Council number 41-283-03
IPX4D
Summary of Contents for Planet Dewy 60 BFR
Page 1: ...Planet Dewy 60 BFR IT CERTIFICAZIONE DEL SISTEMA DI QUALITA AZIENDALE ES FR BE GB RUS RO...
Page 128: ...126 RO RUS GB BE FR ES IT...
Page 153: ...1 152 2 154 3 161 4 164 SIM 27 90 396 CEE 110 C PED 97 23 CEE 1 3 6 PLANET DEWY 60 BFR...
Page 170: ...168 IT ES FR BE GB RUS RO 1 1 FF 2 35 80 C 55 C APRE SPIA VERDE SPIA GIALLA SPIA ROSSA 1 2...
Page 173: ...171 IT ES FR BE GB RUS RO 1 1 Info Info...
Page 174: ...172 IT ES FR BE GB RUS RO 5 61 1 2 3 61 1 3 4 11 12 14 15 17 18 19...
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......