The boiler must be installed in a fixed loca-
tion and only by specialized and qualified
firms in compliance with all instructions
contained in this manual. Furthermore, the
installation must be in accordance with cur-
rent standards and regulations.
2.1
VENTILATION OF
BOILER ROOM
The
“25 OF - 30 OF”
version boilers with
less than 35 kW power can be installed in
domestic environments when simply repla-
cing or in a plant room complying with cur-
rent s t andards In rooms where open
chamber gas appliances are installed, it is
important that at least as much air at least
as much air can arrive as required by nor-
mal combustion of the gas consumed by
the various appliances.
Consequently, it is necessary to make
openings in the walls for the air inlet into
the rooms. These openings must meet the
following requirements:
–Have a total free section of at least 6
cm
2
for every kW of heat input, with a
minimum of 100 cm
2
.
–They must be located as close as possi-
ble to floor level, not prone to obstruc-
tion and protected by a grid which does
not reduce the effective section required
for the passage of air.
The
“25 BFR - 25 BF - 30 BF - 25BFT”
version boilers can instead be installed in
any domestic environment without any
location restrictions or comburent air
requirements.
2.1.1
“BT100” tank unit
Model
“25 BFT”
may be paired with a sepa-
rate
“BT100”
tank unit. The tank units may
be installed near the boiler (beneath or
beside it) or in another room. An optional
hydraulic connection kit (code 8091110) is
available to facilitate installation underneath
the boiler.
2.2
ACCESSORIES AVAILABLE UPON
REQUEST FOR CONNECTION
WITH HEATING SYSTEM
The following optional accessories are avail-
able to facilitate water and gas connection
of the boiler with the heating system:
–installation plate, code 8075407
–codos and gas cock, code 8075421
–small curve and gas/incoming hot water
taps, code 8075418
–cocks kit, code 8091806
–r eplacement wall kit f or t he o t her
makes, code 8093900.
Detailed instructions for assembly of the
unions are provided with the kits.
106
25 BFT” model
2
INSTALLATION
Fig. 3/b
KEY
1 Control panel
2 Gas valve
3 C.H. sensor (SM)
4 100°C safety stat
5 Water-gas exchanger
6 Combustion chamber
7 Fan
8 Positive pressure take-off
9 Negative pressure take-off
10 Somke pressure switch
11 85°C limit stat
12 Flowmeter
13 Automatic breather
14 Motorised diverter valve
15 Pump
16 Ignition transformer
Summary of Contents for Planet 25 BF
Page 1: ...P l a n e t IT ES PT GB...
Page 2: ......
Page 4: ......
Page 136: ......
Page 139: ......