74
EN
Gas supply pressure
Type of gas
G20
G30
G31
Pressure
(mbar)
20
28-30
37
Installation with SPLIT PIPE SYSTEM smoke outlet
Model
Heat
Output
Pressure at nozzles (mbar)
G20
G30
G31
GO 18 BF
Max
13,2 - 13,6
27,8 - 28,2
35,8 - 36,2
min
0,7 - 1,0
2,2 - 2,5
2,9 - 3,2
GO 25 BF
Max
12,6 - 13,0
27,8 - 28,2
35,8 - 36,2
min
1,0 - 1,3
2,8 - 3,1
3,4 - 3,7
GO 30.BF
Max
13,0 - 13,4
27,8 - 28,2
35,8 - 36,2
min
1,8 - 2,1
3,8 - 4,1
4,6 - 4,9
Installation with CONCENTRIC smoke outlet
Model
Heat
Output
Pressure at nozzles (mbar)
G20
G30
G31
GO 18 BF
Max
13,4 - 13,8
27,8 - 28,2
35,8 - 36,2
min
0,9 - 1,2
2,4 - 2,7
3,1 - 3,4
GO 25 BF
Max
12,8 - 13,2
27,8 - 28,2
35,8 - 36,2
min
1,2 - 1,5
3,0 - 3,3
3,6 - 3,9
GO 30.BF
Max
13,2 - 13,6
27,8 - 28,2
35,8 - 36,2
min
2,0 - 2,3
4,0 - 4,3
4,8 - 5,1
– Connect the flue gas analyser to the take-off point
– open one or more of the hot water cocks and start up the
boiler
– determine the combustion data and, if necessary, take a
reading of the combustion efficiency as provided for by the
legislation in force
After taking the readings, close the cocks which were opened
previously and disconnect the flue gas analyser.
7.7
Gas conversion
GO BF
models can be converted from operation with G20
(methane) to operation with G30/G31 (LPG) by installing the
"Nozzle kit for G30/G31 (LPG) - code 5144733 (for
GO 18 BF
), code
5144716 (for
GO 25 BF
and
GO 30.BF
), to be ordered separately
from the boiler.
After replacing the nozzles
it is necessary to set parameter tS 0.2
= 1
.
To adjust the boiler to LPG, during FULL calibration, set PO1 to
the value of 150.
m
CAUTION
The maintenance interventions described must ONLY
be carried out the professionally qualified personnel.
a
WARNING
Before carrying out any interventions described:
– set the main system switch to "OFF"
– close the gas valve
– make sure that no hot parts inside the appliance are
touched.
OFF
Fig. 59
7.7.1
Preliminary operations
To carry out the conversion:
1
2
Fig. 60
– remove the screws (1), pull the front panel (2) forwards and
release it from the top by lifting it
– remove the screws (3) securing the control panel (4)
– move the panel (4) upwards (a) but keeping it in the side
guides (5) to the end of travel
– bring it forwards and down (b) until it is horizontal
3
a
b
5
4
Fig. 61
– unscrew the four screws (3) and remove the front door (4)
of the combustion chamber, working carefully so as not to
damage the insulation
4
3
Fig. 62
Summary of Contents for GO 18 BF G20
Page 10: ...10 ES...
Page 18: ...18 ES...
Page 41: ...41 ES...
Page 50: ...50 EN...
Page 58: ...58 EN...
Page 81: ...81 EN...
Page 83: ...83 RU m Sime 1 1 2 OFF Sime X m Fonderie SIME S p A...
Page 84: ...84 RU d 8 8 OFF d EN 15502 60 C 5 C...
Page 90: ...90 RU...
Page 91: ...91 RU 5 92 5 1 92 5 2 92 5 3 92 5 4 93 5 5 94 5 6 95 5 7 95 5 8 95 5 9 96 5 10 96 5 11 97...
Page 98: ...98 RU...
Page 101: ...101 RU 50 mm 300 mm 900 mm 25 6 5 GO BF m 6 6 m Y R 6 7 pH 6 8 25 f 6 8 GO BF 1 2 3 1 2 3 26...
Page 109: ...109 RU 6 13 2 3 4 7 7 3 4 3 7 45...
Page 111: ...111 RU 7 3 m 1 2 1 2 49 t 6 OFF RESET 50 5 tS0 1 1 1 1 1 1 1 5 5...
Page 116: ...116 RU 7 8 Auto MAnu 1 5 m 6 7 65 tS 1 7 5 t D 5 Auto OFF RESET 66 P01 0 150 6 D 67...
Page 118: ...118 RU 8 8 1 m a OFF OFF 70 8 2 8 2 1 d 8 3 8 3 1 1 2 1 2 71 3 4 4 5 6 3 72 5 6 5...
Page 119: ...119 RU 8 3 2 8 3 3 3 5mm 0 5 0 5 73 m 8 3 4 4 4 4 74 8 4 8 4 1 8 4 2 1 8 5...
Page 121: ...121 RU...
Page 122: ...122...
Page 123: ...123...