Sime 2R HE 10 ErP Original Instructions Manual Download Page 13

36

the proper function of the burner.

The  burner  ignites  regularly  but  the 
flame goes out immediately
–  Check  the  flame  detection,  the  air 

calibration  and  the  function  of  the 
appliance. 

Difficulty in regulating the burner and/
or lack of yield
–  Check:  the  regular  flow  of  fuel,  the 

cleanness  of  the  boiler,  the  non 
obstruction  of  the  smoke  duct,  the 
real input supplied by the burner and 
its cleanness (dust). 

The boiler gets dirty easily
–  Check  the  burner  regulator  (smoke 

analysis),  the  fuel  quantity,  the  flue 
obstruction  and  the  cleanness  of  the 
air duct of the burner (dust).

The boiler does not heat up
–  Control the cleanness of the shell, the 

matching, the adjustment, the burner 
performances,  the  pre-adjusted  tem-
perature,  the  correct  function  and 
position of the regulation stat.

–  Make sure that the boiler is sufficiently 

powerful for the appliance.

Smell of unburnt products
–  Control  the  cleanness  of  the  boiler 

shell  and  the  flue,  the  airtightness  of 
the boiler and of the flue ducts (door, 
combustion  chamber,  smoke  ducts, 
flue, washers).

–  Control the quality of the fuel.

Frequent  intervention  of  the  boiler 
shutoff valve
–  Control  the  presence  of  air  in  the 

system, the function of the circulation 
pumps.

–  Check the load pressure of the appli-

ance,  the  efficiency  of  the  expansion 
tanks and the valve calibration.

3.4  

FROST PROTECTION

In  the  event  of  frost,  ensure  that  the 
central  heating  plant  is  functional  and 
effective  frost  protection  interlocks  are 
in place to protect against frost damage

3.5  

POWER CABLE

It  is  mandatory  that  the  dedicated 
power cable is replaced only with a 
spare  cable  ordered  and  connected 
by  professionally  qualified  person-
nel.

3.6 

DISPOSAL OF THE EQUIPMENT 

Once it reaches the end of its operating life, 
the equipment MUST BE RECYCLED in line 
with current legislation.

IT MUST NOT be disposed of together with 
urban waste.
It can be handed over to recycling centres, 
if  there  are  any,  or  to  retailers  that  offer 
this service.

Recycling prevents potential damage to the 
environment and health. It allows to reco-
ver a number of recyclable materials, with 
considerable  savings  in  terms  of  money 
and energy.

Summary of Contents for 2R HE 10 ErP

Page 1: ...TIONS ORIGINALES ORIGINALANLEITUNG ORIGINALANWEISUNGEN INSTRUCȚIUNI ORIGINALE ΑΡΧΙΚΕΣ ΟΔΗΓΙΕΣ Gentile Cliente metta in funzione la sua nuova caldaia entro 30gg dalla data di installazione da personale professionalmente qualificato Potrà così beneficiare sia della garanzia legale sia della garanzia convenzionale Sime che trova alla fine di questo manuale NL DE RO GR IT ES ENG FR ...

Page 2: ...2 5 ELECTRICAL CONNECTION 3 USE AND MAINTENANCE 3 1 COMMISSIONING THE BOILER 33 3 2 LIGHTING AND OPERATION 3 3 REGULAR CLEANING 34 3 4 FROST POTECTION 35 3 5 POWER CABLE 3 6 DISPOSAL OF THE EQUIPMENT 2R HE ErP ENGLISH CONFORMITY Our Company declares that 2R HE ErP boilers comply with the essential requirements of the following directives Boiler Efficiency Directive 92 42 EC Ecodesign Directive 200...

Page 3: ... INPUT MAX HEAT OUTPUT MAX MAX OPERATING PRESSURE CONTENTS D H W HEAT INPUT MAX D H W MAX OPERATING PRESSURE D H W D H W FLOW RATE POWER SUPPLY MAX POWER ABSORBED TYPE CODE DIRECTIVE OF REFERENCE PIN NUMBER MAX OPERATING PRESSURE MAX OPERATING PRESSURE D H W 1 2 1 Technical data plate fig 2 Fig 2 2R HE 6 ErP 7 ErP 8 ErP 9 ErP 10 ErP 11 ErP 12 ErP 13 ErP L Depth mm 1232 1355 1478 1601 1724 1847 197...

Page 4: ...392 4 392 Water content l 74 2 84 3 94 9 105 5 116 1 126 7 137 4 147 9 Smokes loss of head mbar kPa 0 35 0 034 0 45 0 044 0 50 0 049 0 55 0 054 0 65 0 064 0 75 0 073 0 85 0 083 0 90 0 088 Combustion chamber pressure mbar kPa 0 42 0 041 0 55 0 054 0 65 0 064 0 75 0 073 0 85 0 083 1 10 0 108 1 49 0 146 1 56 0 153 Suggested chimney depression mbar kPa 0 15 0 015 0 15 0 015 0 15 0 015 0 15 0 015 0 15 ...

Page 5: ...ta 1 5 1 Burners assembly fig 4 The boiler door details is shown in figure 3 a for burner mounting The burners must be regulated such that the CO2 value is that indicated in point 1 3 with a tolerance of 5 28 Fig 4 C A B 2R HE A B C mm mm ø 6 ErP 130 170 M8 7 ErP 130 170 M8 8 ErP 130 170 M8 9 ErP 130 170 M8 10 ErP 160 190 M10 11 ErP 160 190 M10 12 ErP 160 190 M10 13 ErP 160 190 M10 1 5 2 Permanent...

Page 6: ... rear insulation panel 4 fasten the lower cross beam 3 to the cast iron body with two hex head screws fasten the sides 5 6 to the supports 1 with four self tapping screws and lock them in the back using nuts inser ted on the tie rods install the upper rear panel 7 8 with the four self tapping screws supplied fasten the control panel 9 to the corners 2 with the four self tapping screws supplied unw...

Page 7: ...30 4 x 4 x 5 x 4 x 2 x 13 17 16 18 19 6 x 20 14 15 15 7 8 7 8 13 15 15 20 19 5 6 11 21 21 4 Fig 5 b ...

Page 8: ...pan sion vessel with a capacity of 8 litres and a maximum pressure of 8 bar 784 kPa The tank should be of the membrane type made of natural rubber caou tchouc which is suitable for foods 2 4 CONNECTING UP FLUE The flue is of fundamental importance for the proper operation of the boiler if not installed in compliance with the stand ards starting the boiler will be difficult and there will be a cons...

Page 9: ...rner optional B1 Permanent feeding dual level burner optional B2 Direct feeding Burner TA Room stat OP Programmer s clock NO TE When a room stat TA is to be fitted remove the link between terminal 4 and 5 on the connector plug To connect the programmer s clock OP remove the link between terminals 5 and 6 NOTE The brown capped off cable and black capped off cable has to be exclusively used in case ...

Page 10: ...to confirm 3 USE AND MAINTENANCE WARNINGS In case of failure or malfunction of the equipment contact authorised technical staff For safety reasons the User cannot access the internal parts of the appliance All operations involving the removal of protections or otherwise the access to dan gerous parts of the appliance must be performed by qualified personnel The appliance can be used by children un...

Page 11: ...less than 1 bar 98 kPa reset the system 3 2 5 Turnig OFF boiler fig 7 To temporarily turn off the boiler turn off the electricity supply by pressing the main switch The following operations must be carried out if the plant will not be in use for a lengthy period of time position the main switch of the plant on off turn the fuel and water taps of the cen tral heating plant off empty the central hea...

Page 12: ...n the appliance and the relevant list of actions required A working fault in most cases provo cates the lock out signal onto the con trol panel of the control box When this light turns on the burner can operate again only after the reset button has been pressed if this has been done and a regular ignition occurs it means the failure can be defined momentary and not dangerous On the contrary if the...

Page 13: ... of the flue ducts door combustion chamber smoke ducts flue washers Control the quality of the fuel Frequent intervention of the boiler shutoff valve Control the presence of air in the system the function of the circulation pumps Check the load pressure of the appli ance the efficiency of the expansion tanks and the valve calibration 3 4 FROST PROTECTION In the event of frost ensure that the centr...

Page 14: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it Documentation Dpt Fonderie Sime S p A ...

Reviews: