Supply Power to the System
007-5922-001
27
Check all Cable Connections and Airflow
Make sure all power and data cables are properly connected and not blocking the system airflow.
Check the Airflow
The system component layout was carefully designed to direct sufficient cooling airflow to the
components that generate the most heat.
Note:
Make sure that all power and data cables have been routed in such a way that they do not
block the airflow generated by the enclosure fans.
Supply Power to the System
Connect the power cords from all the power supply modules (located at the rear of each enclosure)
into a power strip or power distribution unit (PDU). An optionally available uninterruptible power
supply (UPS) can ensure power availability if primary power fails.
Summary of Contents for IS2224
Page 1: ...SGI NAS ISS3124 RP2 Server and IS2224 JBOD Setup Guide 007 5922 001 ...
Page 3: ...007 5922 001 iii Record of Revision Version Description 001 October 2013 First release ...
Page 4: ......
Page 8: ......
Page 24: ......
Page 44: ......
Page 56: ......
Page 60: ......
Page 66: ......
Page 68: ......
Page 72: ......