18
007-5922-001
2: ISS3124-RP2 Server and IS2224 JBOD NAS System Hardware Installation
Position the IS2224 Mounting Rails
Position the mounting rails in the rack using the following steps, see Figure 2-7 as a reference.
(1) Mounting Rail
(2) Existing Storage Enclosure
(3) Clearance Above and Below the Existing Enclosure
(4) Screws for Securing the Mounting Rail to the Rack rails (Front and Rear)
(5) SGI D-Rack front panel or Industry Standard Cabinet
Figure 2-7
Position the Mounting Rails in the Rack
Tip:
If you are installing the mounting rails above an existing storage enclosure, position the
mounting rails directly above the storage enclosure. If you are installing the mounting rails below
an existing storage enclosure, allow 8.8-cm (3.5-in.) vertical clearance for a storage enclosure.
Summary of Contents for IS2224
Page 1: ...SGI NAS ISS3124 RP2 Server and IS2224 JBOD Setup Guide 007 5922 001 ...
Page 3: ...007 5922 001 iii Record of Revision Version Description 001 October 2013 First release ...
Page 4: ......
Page 8: ......
Page 24: ......
Page 44: ......
Page 56: ......
Page 60: ......
Page 66: ......
Page 68: ......
Page 72: ......