59
Chapter 5
5.
System Configuration and Operation
This chapter describes how to configure and operate your system correctly.
Warning:
The rackmount system operates on 200-240 VAC. Use extreme caution
when working around this voltage. Never install or remove power cords without first
turning off the equipment.
Caution:
The rackmount system can weigh up to 750 pounds when fully configured.
Use at least two people to move the system chassis and take care that the system does not
tip or become unbalanced. Also use at least two people to move the monitors. Be sure to
practice proper lifting techniques.
Customer maintenance is limited to the outside of the chassis, which contains the
peripherals. No user-serviceable parts are found within the chassis.
Note:
This product requires the use of external shielded cables in order to maintain
compliance with Part 15 of the FCC rules.
Summary of Contents for 2400
Page 1: ...SGI 2400 and 2800 Server Owner s Guide Document Number 007 4192 001 ...
Page 8: ......
Page 12: ......
Page 14: ......
Page 20: ......
Page 23: ...System Features 3 Figure 1 2 SGI 2400 Multirack System Configuration Example ...
Page 34: ......
Page 78: ......
Page 81: ...Connecting Your Terminal 61 Figure 5 1 Connecting a Terminal Terminal Console port ...
Page 98: ......
Page 107: ...General Procedures 87 Figure 6 5 Turning Off the PDU PDU off PDU on PDU power switch ...
Page 117: ...Specific Procedures 97 Figure 6 12 Removing the System Controller and CD ROM ...
Page 142: ......