![Siko MSK5000 Translation Of The Original Installation Instructions Download Page 32](http://html1.mh-extra.com/html/siko/msk5000/msk5000_translation-of-the-original-installation-instructions_1270568032.webp)
MSK5000
Commissioning English
MSK5000 · Date
11.09.2018 · Art.
No.
83109 · Mod.
status
232/18
32
5 Commissioning
Following correct mounting and wiring you can put the measuring system
into operation by switching on operating voltage.
After switching on, the device initializes itself independently. The "power"
LED (green) in the sensor housing lights up. While the magnetic sensor
travels over the magnetic tape, the LEDs A, B and I/R (red) are lighting
accordingly.
1
plastic housing
design K
2
metal housing
design M
Fig. 11: LEDs
Power A B I/R
A B I/R Power
The measuring system MB500/1, MR500, MBR500 is a compo-
nent of an incremental measuring system which must be referenced at a
defined position (reference point) for absolute measurement. For this pur-
pose, the reference signal must be linked to the signal of a reference value
encoder (e. g. proximity switch).
6 Travel/circumferential speeds (m/s)
Formula for calculating the travel speed:
V max.
=
(in m/s)
Resolution mm
Pulse interval s x 1000
x 0.8
Example:
Resolution: 0.01 mm
Pulse interval: 2.5 μs
V =
0.01
0.0000025 x 1000
x 0.8 = 3.2 m/s
Summary of Contents for MSK5000
Page 38: ...MSK5000 38...
Page 39: ...MSK5000 39...